Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Huxley, IA

Enter your ZIP and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Huxley, IA?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Huxley

We are a family owned business that has been serving the Des Moines area as well as all of Iowa for 30+ years we are experts in new asphalt installation, asphalt repair, seal coating, grading and anything asphalt.


Zed Construction

33rd St
No reviews yet

Zed Construction

33rd St
No reviews yet
6 years of experience

general construction, concrete finishing and stamping, installing, demo, large or small we get dirty doing them all. we do it all in one call making your dream home and improvements to give you the memoiys that make you completely love your home

general construction, concrete finishing and stamping, installing, demo, large or small we get dirty doing them all. we do it all in one call making your dream home and improvements to give you the memoiys that make you completely love your home


"Jason Moore and his crew at Spot on Construction exceeded my expectations! And that's hard to do! If you need a job done right, they are the crew for the job!"

Jim E on April 2021

Here to help with all your construction needs; Roofing, Siding, Driveways, Concrete and Masonry. Give us a call today!

"Jason Moore and his crew at Spot on Construction exceeded my expectations! And that's hard to do! If you need a job done right, they are the crew for the job!"

Jim E on April 2021


"We had such an amazing experience with this company. Chris did an amazing job on power washing and staining our basement floor. - Quick AND cost-friendly estimate - Fast response and communication time - Did EXACTLY what we wanted in the picture we sent him - Texted us every step of the project timeline - Got the project done in less than 48 hours We will be using this company again, and can guarantee you will be satisfied if you go with them! Thank you!"

Samantha D on June 2024

Anything concrete Concrete driveways Patios Steps Colored decorative concrete New construction basements , garages. Additional phone number - (515) 208-7415

"We had such an amazing experience with this company. Chris did an amazing job on power washing and staining our basement floor. - Quick AND cost-friendly estimate - Fast response and communication time - Did EXACTLY what we wanted in the picture we sent him - Texted us every step of the project timeline - Got the project done in less than 48 hours We will be using this company again, and can guarantee you will be satisfied if you go with them! Thank you!"

Samantha D on June 2024


"The quality of work was outstanding. The communication was good, and the quality was good. They started and finish in a timely fashion."

Jason F on March 2022

Locally owned and operated. Give us a call or click to request a quote today!

"The quality of work was outstanding. The communication was good, and the quality was good. They started and finish in a timely fashion."

Jason F on March 2022


Avatar for Mikes General Contracting

Mikes General Contracting

3224 SW 12th St
4.43(
7
)

Mikes General Contracting

3224 SW 12th St
4.43(
7
)
Customers say: Quick response
18 years of experience

Mikes General Contracting is a small company set to personally accommodate your specific needs. I Mike Signs work every job no matter how small or large from start to finish to ensure that you receive the best results for each and every job. I am happy to meet with you for a consultation and free estimate. We gladly accept credit cards

"We hired Mike because of Angie's List rating. He started this project on May 1st, 2019 and he said it would be a 2 - 3 week project. Mike's policy is he does the labor and you buy the materials. We ordered tile which was delivered a month in advance by the tile company. When Mike started laying the tile it was discovered there were 2 different finishes to the tile (glossy and matte which was the tile company's fault). Mike didn't notice this my wife did. This is where things started to unravel. The tile company couldn't get the matte finish we wanted for another month because it was back-ordered. So it was up to me to track down another supplier (which I did in Louisiana and had it shipped within 3 days. From that point forward it was like pulling teeth to get Mike over here to work on our project. He would show up for a few hours on weekends and said he had other projects that he had scheduled so he would have to do ours when he could find time. He claimed our project became bigger than we originally talked about and it compromised all his other projects ( we had one additional request to move a toilet and install a half wall which HE AGREED was fine to add). We had him install a vanity which required moving some plumbing (Mike went with me to pick up the vanity). He later complained he didn't anticipate it would require moving plumbing so that set him back (isn't it a contractors job to measure things?). When moving the plumbing he had to remove drywall. After he moved the plumbing he installed the vanity without repairing the drywall he removed so now it's impossible to fix. We wanted bullnose in our shower niches and he complained it was time-consuming. So we went to get another tile trim solution that would be easier to install (this required me to drive to Omaha to pick up product). I had the product back on Monday and he didn't come back until the next weekend to work on. We had electrical and plumbing work that could have been worked on without Mike but he wouldn't send them over to finish. To get a hold of Mike and have him respond (basic communication) was almost impossible. Mike was supposed to install a shower door and paint to finish things up. When I said we wanted to pick out our own shower door and paint he got angry. He actually got into a shouting match with my wife. We wanted Sherwin Williams paint and he actually said "I don't paint with Sherwin Williams. I never have and I never will. If you want Sherwin Williams do it yourself!" That was the last straw. I asked Mike to come pick up his things and we were done. Now I'm having to find other contractors to finish the job (drywall, plumber, electrician, tile). The contractors that have come in are appalled at the way we were treated and the shoddy work that was done. It's the middle of July and our project is still not done. We're hoping we can finish by the end of July. THIS PROJECT WAS A NIGHTMARE! I WOULD NOT RECOMMEND THIS COMPANY FOR ANY KIND OF WORK! CRAFTSMANSHIP, COMMUNICATION, PROFESSIONALISM, DEPENDABILITY, RESPONSIVENESS, AND BASIC LACK OF CUSTOMER RESPECT DOES NOT COME CLOSE TO THE A RATING FOR WHICH WE HIRED THIS COMPANY."

Tim A on July 2019

Mikes General Contracting is a small company set to personally accommodate your specific needs. I Mike Signs work every job no matter how small or large from start to finish to ensure that you receive the best results for each and every job. I am happy to meet with you for a consultation and free estimate. We gladly accept credit cards

"We hired Mike because of Angie's List rating. He started this project on May 1st, 2019 and he said it would be a 2 - 3 week project. Mike's policy is he does the labor and you buy the materials. We ordered tile which was delivered a month in advance by the tile company. When Mike started laying the tile it was discovered there were 2 different finishes to the tile (glossy and matte which was the tile company's fault). Mike didn't notice this my wife did. This is where things started to unravel. The tile company couldn't get the matte finish we wanted for another month because it was back-ordered. So it was up to me to track down another supplier (which I did in Louisiana and had it shipped within 3 days. From that point forward it was like pulling teeth to get Mike over here to work on our project. He would show up for a few hours on weekends and said he had other projects that he had scheduled so he would have to do ours when he could find time. He claimed our project became bigger than we originally talked about and it compromised all his other projects ( we had one additional request to move a toilet and install a half wall which HE AGREED was fine to add). We had him install a vanity which required moving some plumbing (Mike went with me to pick up the vanity). He later complained he didn't anticipate it would require moving plumbing so that set him back (isn't it a contractors job to measure things?). When moving the plumbing he had to remove drywall. After he moved the plumbing he installed the vanity without repairing the drywall he removed so now it's impossible to fix. We wanted bullnose in our shower niches and he complained it was time-consuming. So we went to get another tile trim solution that would be easier to install (this required me to drive to Omaha to pick up product). I had the product back on Monday and he didn't come back until the next weekend to work on. We had electrical and plumbing work that could have been worked on without Mike but he wouldn't send them over to finish. To get a hold of Mike and have him respond (basic communication) was almost impossible. Mike was supposed to install a shower door and paint to finish things up. When I said we wanted to pick out our own shower door and paint he got angry. He actually got into a shouting match with my wife. We wanted Sherwin Williams paint and he actually said "I don't paint with Sherwin Williams. I never have and I never will. If you want Sherwin Williams do it yourself!" That was the last straw. I asked Mike to come pick up his things and we were done. Now I'm having to find other contractors to finish the job (drywall, plumber, electrician, tile). The contractors that have come in are appalled at the way we were treated and the shoddy work that was done. It's the middle of July and our project is still not done. We're hoping we can finish by the end of July. THIS PROJECT WAS A NIGHTMARE! I WOULD NOT RECOMMEND THIS COMPANY FOR ANY KIND OF WORK! CRAFTSMANSHIP, COMMUNICATION, PROFESSIONALISM, DEPENDABILITY, RESPONSIVENESS, AND BASIC LACK OF CUSTOMER RESPECT DOES NOT COME CLOSE TO THE A RATING FOR WHICH WE HIRED THIS COMPANY."

Tim A on July 2019


Hodson Construction and Remodeling

252 Ne 57th Pl
No reviews yet

Hodson Construction and Remodeling

252 Ne 57th Pl
No reviews yet
14 years of experience

We have been in business for four years now and going strong. We have over a combined 50 years of experience in the business. We do anything and have done anything from new construction to remodeling. No project is to small. We always get back to our customers right away if missed while being on a job site. Customer service is the most important thing to us. We give free estimates, call today.

We have been in business for four years now and going strong. We have over a combined 50 years of experience in the business. We do anything and have done anything from new construction to remodeling. No project is to small. We always get back to our customers right away if missed while being on a job site. Customer service is the most important thing to us. We give free estimates, call today.


Avatar for Absolute Construct

Absolute Construct

608 Washington
No reviews yet

Absolute Construct

608 Washington
No reviews yet
15 years of experience

We operate as many crews as permitted at one time depending on the demand received and the specialities of our employees. We offer general contracting, which includes any subcontracting needed to complete from start to finish. We will see each project through ensuring it is done correctly, efficiently and in a professional manner. Our bills are sent out as each phase is completed, ensuring payments for work that has been completed, accepting cash, credit, and check.

We operate as many crews as permitted at one time depending on the demand received and the specialities of our employees. We offer general contracting, which includes any subcontracting needed to complete from start to finish. We will see each project through ensuring it is done correctly, efficiently and in a professional manner. Our bills are sent out as each phase is completed, ensuring payments for work that has been completed, accepting cash, credit, and check.


All Iowa Construction Services

2151 Dean Ave
No reviews yet

All Iowa Construction Services

2151 Dean Ave
No reviews yet
28 years of experience

The staff at AICS are well seasoned and have been with the company for several years. We have craftsman ranging from building designers to concrete to roofing to welding. We service Residential Commercial, Agricultural, and Industrial projects.

The staff at AICS are well seasoned and have been with the company for several years. We have craftsman ranging from building designers to concrete to roofing to welding. We service Residential Commercial, Agricultural, and Industrial projects.


Showing 1-10 of 16
Asphalt Driveways questions, answered by experts

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

Unlike drying, which takes between 48 and 72 hours on average, asphalt driveway cure times are different and take much longer. Your asphalt driveway won’t actually cure for around six months to one year. During this time, it’s more likely to get damaged or weakened by heavy machinery, vehicles, and high temperatures. 

Installing a heated driveway is often worth the cost because it will significantly boost a home's value, especially in areas that often suffer from heavy snow and freezing temperatures. Even if you only install the basic components and never activate the heating system yourself, giving the future buyer an option to finish the system can still increase your home’s value.

There’s no single best asphalt grade—it all comes down to where and how it’s used. Highways and heavy-traffic roads need something tough, like polymer-modified asphalt (PMA) or Stone Matrix Asphalt (SMA). Local roads and parking lots rely on the Performance Graded (PG) system, chosen based on climate. A PG 64-28 mix, for example, handles a broad temperature range while simpler, more cost-effective mixes are typically enough for residential driveways. The best grade of asphalt depends on traffic, weather, and your budget, which is why a professional’s input is always a smart move before making a decision.

An asphalt driveway should be at least 3 inches thick over a compacted gravel base. Areas with poor drainage should have a thicker stone base. To install a new asphalt driveway over an existing driveway, the new asphalt should be at least 2 inches thick and the existing driveway should be in relatively good condition.

The Huxley, IA homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.