Top-rated excavation pros.

Best excavation pros near Luthersville, GA

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Luthersville, GA?

Select your specific project to find the pro for you.

TRUSTED BY LUTHERSVILLE, GA HOMEOWNERS

  • Average homeowner rating star icon4.8
    Average homeowner rating
  • Verified reviews icon15
    Verified excavation services reviews

Top-Rated Excavation pros in Luthersville - Updated Nov 2026

Avatar for Outlaw lawn care
Outlaw lawn care
5.0(
3
)
Landscape - Minor Grading or Resloping

Serving Luthersville, GA and surrounding areas

Approved

Free estimates

"Outlaw Lawn Care did a great job refreshing my pine straw. It was a big job on a very steep hill. He kept appointments and delivered what was promised. I’d whole heartedly recommend Outlaw Lawn Care!"
24 neighbors recently requested a quote
EAST ATLANTA JUNK REMOVAL
New to Angi
Landscape - Minor Grading or Resloping

Serving Luthersville, GA and surrounding areas

Approved

East Atlanta Junk Removal provides fast, reliable, and professional junk removal services throughout Atlanta and surrounding areas. We handle everything from single-item pickups to complete property cleanouts, including furniture, appliances, household junk, garage and basement cleanouts, yard debris, construction debris, move-out cleanouts, and commercial jobs.\n\nOur goal is simple: show up on time, work efficiently, respect your property, and leave your space clean and clutter-free. No job is too big or too small. Whether you’re a homeowner, renter, landlord, realtor, contractor, or business owner, we’re ready to help.\n\nContact East Atlanta Junk Removal for dependable service, fair pricing, and FREE estimates. Same-day and next-day service may be available.

3 neighbors recently requested a quote
Cleeflen junk removal
New to Angi
Landscape - Minor Grading or Resloping

Serving Luthersville, GA and surrounding areas

Approved

I’m the owner of Cleeflen Junk Removal, proudly serving Metro Atlanta and surrounding areas. We provide fast, reliable, and professional junk removal for homes, apartments, offices, property managers, and businesses.\n\nWe can help with furniture removal, appliance removal, garage cleanouts, apartment cleanouts, eviction cleanouts, yard debris, moving cleanouts, and general junk hauling.\n\nOur goal is simple: show up on time, provide fair and upfront pricing, and leave your space clean and clutter-free. We offer free estimates and flexible scheduling.\n\nCall or text Cleeflen Junk Removal at (678) 496-1905 for dependable service.

...
Showing 1-10 of 151
Excavating FAQs, answered by experts

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

It takes one hour to dig a 10-foot trench by hand. Use a trenching shovel with a sharp tip and a long head. Plan for more time if your soil is heavy or rocky. Consider renting a trencher if you’re digging a long or deep trench or if you have challenging soil or terrain. 

The physical constraints of hand-drilling a well limit the depth you can achieve. Manually digging with picks and shovels may only lead to shallow wells of up to 60 feet in depth. To reach greater depths, you need more specialized equipment. The diameter of your well and the tools you’re using will determine how far down you can dig.

No, fire blight does not survive free in the soil but instead is carried through insects, animals, rain, or wind during the spring. Keep in mind that it can also spread on tools, which is why you should always disinfect them in between cuts.

A perc test can take anywhere from one to eight hours to complete. The total time depends on factors like the amount of excavation required, the depth and width of the holes, and whether multiple test holes are needed. For a single hole, the process of filling it with water and monitoring the drainage rate usually takes less than an hour. Professionals can often complete the entire test in a single day. While it's possible to get results the same day, some companies may take a few days to provide the official report.

The Luthersville, GA homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.