Top-rated basement remodelers.

Best basement remodelers near Chickamauga, GA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Chickamauga, GA?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Chickamauga - Updated Nov 2026

Avatar for IMPROVE AMERICA INC
IMPROVE AMERICA INC
4.6(
93
)
Basement - Remodel

Serving Chickamauga, GA and surrounding areas

Approved

In business since 1979

Free estimates

Warranties offered

"Mel made sure everything went like I wanted.workers was polite and did a great job .didn't have to wait 6 months before work was started .fast and did a great job .now get to enjoy sitting on my screen in porch"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+22

Response time2 days
12 neighbors recently requested a quote
Recommended by91%of homeowners
Miller Light Construction LLC
5.0(
12
)
Basement - Remodel

Serving Chickamauga, GA and surrounding areas

Approved

In business since 2022

Free estimates

Emergency services offered

"As a real estate agent - I am always looking for reliable vendors to help me with my client's needs. Trevor and his crew have always been professional and easy to work with. I have used them in my personal home as well. I highly recommend them for all of your construction needs!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+17

Response time2 days
Response rate100%
6 neighbors recently requested a quote
Avatar for AAA Basement Waterproofing
AAA Basement Waterproofing
4.8(
83
)
Basement - Remodel

Serving Chickamauga, GA and surrounding areas

In business since 1995

Free estimates

Emergency services offered

"Jeff told me the foundation settling was very minor for a house built in the 1970's.  No water problems in basement.  He did recommend I have the gutters replaced, with 6" gutters, and to make sure water is draining away from house.  Also, he asked me to contact him if the foundation settled more in the future.  He did not do any work other than give me a free evaluation.  Jeff was very professional and honest. I will definitely use his company if I have anymore foundation or drainage issues.
"
Full Interior Encap Sys
Full Interior Crawl Drainage Sys
Before Crawl Drainage System
Before Sub-Floor System
After Sub-Floor System

+5

Recommended by100%of homeowners
Avatar for Basement and Crawlspace Solutions
Basement and Crawlspace Solutions
4.8(
6
)
Basement - Remodel

Serving Chickamauga, GA and surrounding areas

In business since 2019

Free estimates

Emergency services offered

"Other than a very poor salesman who repeatedly made mistakes on his three contracts ,after verbal agreement as to the final price and services to be rendered , which the owner rectified the work itself was very good."
Before picture of bare dirt floor.
Hotel Crawlspace Encapsulation
Job completed with 20 Mil vapor barrier installed.
Hotel Crawlspace Encapsulation
Dehumidifier mounted.

+49

Recommended by100%of homeowners
Avatar for Optimal Home Solutions LLC
Optimal Home Solutions LLC
5.0(
7
)
Basement - Remodel

Serving Chickamauga, GA and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"They were everything we were wanting and MORE! We have had our share of bad workers on our home... and Harvey and Michael went above and beyond. We had several different jobs for them to take care of and they did a great job - left no mess, definitely left things way better than they were before, and were so kind and helpful! I would 1000% recommend them to anyone needing a general contractor!"
Level the support used for lifting the floor
Mold
Basement Waterproofing Project
Remodeling - General Project
Column repair, Drywall Repair, Exterior painting,

+149

Recommended by100%of homeowners
Showing 1-10 of 32
Basement Remodel FAQs, answered by experts

It is common for a contractor to ask for a down payment before starting a project, especially for jobs that require purchasing materials and equipment or hiring a crew. The deposit amount can range from 10% to 50% of the total job cost. While a request for up to 50% is not unusual, a contractor should not ask for more than that, and you should never pay for a project in full before the work has begun. To protect yourself, always discuss payment terms before starting and have a written contract that outlines the project timeline and expectations. Additionally, be sure to hire reputable contractors and check their licensing and insurance before the project begins.

You technically can paint wires in a basement ceiling, but there are several important safety and code considerations. It's safe to paint non-metallic sheathed cable as long as the labeling remains visible. You can also paint low-voltage wires and conduit and junction boxes to help them blend into your basement. 

However, you should not paint damaged or deteriorated wiring is a fire hazard because it poses a fire hazard. The same goes for painting over high-heat wires that connect to heat-generating appliances or systems. Be sure to avoid painting multiple coats onto any wires, as that traps heat and poses fire risks.

You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Chickamauga, GA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.