Top-rated house leveling pros.

Best house leveling pros near Tice, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your house leveling project in Tice, FL?

Select your specific project to find the pro for you.

TRUSTED BY TICE, FL HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon63
    Verified house leveling services reviews

Top-Rated House leveling pros in Tice - Updated Nov 2026

Avatar for LHS BUILDING SERVICES LLC
LHS BUILDING SERVICES LLC
4.8(
67
)
Find a Custom Home Builder

Serving Tice, FL and surrounding areas

Approved

In business since 2010

Free estimates

Customers say: True professional

"I could not ask for a better contractor than Norm Bloxham and his team. In fact, I was so happy with the service they provide that I not only used them to build a large custom home for my husband and I twelve years ago, I used them again to work on this very complicated custom buildout of our new condo. Norm Bloxham and my Foreman, Jesse Cueto, went above and beyond on this very difficult project. The level of professionalism Norm and his team bring to the table is excellent from start to finish. I would highly recommend them to anyone looking for a top notch contractor."
Additional Photos
Master Bath Remodel
Master Bath Remodel
Master Bath Remodel
Powder Bath

+32

32 neighbors recently requested a quote
Recommended by85%of homeowners
Avatar for LRE Foundation Repair, LLC
LRE Foundation Repair, LLC
4.5(
74
)
Concrete Foundation - RepairConcrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Tice, FL and surrounding areas

Approved

In business since 1989

Free estimates

Emergency services offered

"Trucks and workers were promp and worked all day preparing for the concrete. We had extended the width of driveway. They poured leveled and gave instructions to water it daily. Sounds strange but they said it has to for proper curing."
The homeowner's driveway had endured years of wear and tear, resulting in discoloration and numerous cracks across the surface. Additionally, the concrete slabs had become uneven due to the soil settling beneath them.
Due to soil settlement and poorly placed control joints, the customer's driveway had significant cracking. You can see that some stains have formed, indicating that the concrete lacks sealant protection.
The homeowner knew that their home's addition had experienced settlement damage when vertical cracks appeared on the exterior walls.
The homeowner became alarmed when they noticed stair-step cracking patterns emerging from the window frame in the exterior wall of the home.
Upon noticing significant cracks developing in the walls, the homeowner became concerned about their foundation's condition.

+158

Response time11 hrs
Response rate100%
7 neighbors recently requested a quote
VM Renovations & Maintenance
5.0(
4
)
Find a Custom Home Builder

Serving Tice, FL and surrounding areas

Approved

In business since 2022

Free estimates

Credit card accepted

"Vince did wonderful work on my new kitchen cabinets and new backsplash. He was thorough and kept me well informed throughout the process. I would recommend him to anyone I know who needs work done at their house. I will be hiring him again in the near future for other stuff needed to be done at my home."
Response time5 hrs
6 neighbors recently requested a quote
Recommended by100%of homeowners
Sun Country Homes of Florida, Inc.
4.1(
5
)
Find a Custom Home Builder

Serving Tice, FL and surrounding areas

Approved

In business since 1997

Free estimates

Customers say: Quality work

We are a locally owned and operated company that has been business for 23 years. We value honesty and integrity in all aspects of our business. We specialize in new custom home builds and we pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building lasting relationships with our clients and guarantee your satisfaction!

Response time3 days
Response rate100%
Recommended by80%of homeowners
Avatar for Homm Developers
Homm Developers
New to Angi
Concrete - Injection Leveling - Mudjacking

Serving Tice, FL and surrounding areas

Approved

We help homeowners and investors complete their construction projects the right way—on time, on budget, and with high-quality workmanship. Our experience covers everything from foundations and framing to roofing, drywall, painting, and flooring.\nWe believe in honest communication, detailed planning, and strong supervision to avoid surprises and delays. Every project is treated as an investment that deserves care, precision, and accountability.\nOur priority is delivering long-lasting results and earning our clients’ trust on every job.

...
Showing 1-10 of 104
House Leveling FAQs, answered by experts

Charges correlate with surface size, settlement depth, and access, often yielding significant savings over concrete replacement.

Trenching and boring are two distinct methods for installing underground utilities. Trenching involves digging a channel using equipment like an excavator, trencher, backhoe, or shovel. While it is a simpler process, it causes significant disruption to the surface, landscaping, and surrounding ecosystems.

Boring, also known as directional boring, is a less invasive alternative that uses a drill to create a tunnel for utility lines without disturbing the surface. This method is more precise and is ideal for installations that need to go underneath buildings, roads, or bodies of water. Although boring is less disruptive, it is generally more expensive than trenching.

Mudjacking restores level surfaces, prevents further damage, and is more cost-effective than a full replacement.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

The Tice, FL homeowners’ guide to house leveling services

From average costs to expert advice, get all the answers you need to get your job done.