Top-rated basement remodelers.

Get matched with top basement remodelers in Mascotte, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Mascotte, FL?

Select your specific project to find the pro for you.

Find Basement remodelers in Mascotte

Avatar for Witty Innova Solutions
Witty Innova Solutions
4.8(
24
)
Basement - Remodel

Serving Mascotte, FL and surrounding areas

In business since 2017

Emergency services offered

Credit card accepted

"Great experience with this company with the remodeling at my property, totally recommended, there were responsible, professional and diligent on timely manner, nothing bad to say, everything was as expected."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+352

Recommended by69%of homeowners
Avatar for Florida Lifetime Impact Window & Door Inc
Florida Lifetime Impact Window & Door Inc
4.1(
20
)
Basement - Remodel

Serving Mascotte, FL and surrounding areas

In business since 2009

Free estimates

Credit card accepted

"The quality of the installation wasn't very good; I had to have them come back several times. They ended up having to install a new door. However, the main principle of the company did come out afterwards to make some minor adjustments and to make sure we were satisfied."
Sliding Galss Door
Wall of windows
Additional Photos
Recommended by85%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Mascotte, FL and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Smith, Broomfield & Howard Construction
Smith, Broomfield & Howard Construction
5.0(
3
)
Basement - Remodel

Serving Mascotte, FL and surrounding areas

In business since 2010

Free estimates

Credit card accepted

Smith, Broomfield & Howard Construction has been in business since 2010 as a licensed certified builder. Our specialties are kitchen and bathroom remodeling. With us there's no job too small as all jobs deserves the same degree of attention and detail. We are owner operated so we guarantee consistently a finished project that you'll love.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+9

Recommended by100%of homeowners
...
Showing 1-10 of 54
Basement Remodel questions, answered by experts

Yes, you can add a bathroom to an unfinished basement, but you’ll want to take proper precautions if doing so. As with any bathroom addition, you’ll need to make sure that it’s approved by local building authorities first. With unfinished basements, you especially need to keep an eye on proper ventilation practices.

Rebar is an essential part of reinforcing a basement floor, as not having it can impact its structural integrity. It helps absorb the tension factors that contribute to cracks in your floor and strengthens its load-bearing capabilities by evenly distributing the weight. Not including rebar could lead to an unstable floor, so don’t skip it!

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Envision the type of bar experience you'd like to create for your guests. For example:

  • Does your basement have enough finished space for bar stools or seating?

  • What type of additional lighting would set the tone for the room?

  • Are there basement windows or an HVAC system?

  • Do you need new plumbing in your basement for a proper wet bar?

  • Could you be happy with a built-in wall cabinet bar rather than a full-scale wet bar?

Finishing a basement can provide a great return on investment, by increasing the market price of your home when you want to sell. Beyond that, there are many reasons to finish your basement. Doing so expands the usable square footage of your home, so you can enjoy it more, even as your family grows. Renovating your basement costs less in terms of time, energy, and money than having to search for and buy a new home.

The Mascotte, FL homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.