Top-rated excavation pros.

Get matched with top excavation pros in Greenville, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Greenville, FL?

Select your specific project to find the pro for you.

Find Excavation pros in Greenville

Avatar for Conway land clearing and site prep
Conway land clearing and site prep
5.0(
9
)
Excavation - Major Grading or ReslopingBuilding Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For Business+2 more

Serving Greenville, FL and surrounding areas

Approved

Free estimates

Customers say: Super punctual

"Prompt response, listened to the detail of the job and was very helpful with ideas and also worked within my budget. I’m very happy with the outcome! I will definitely hire again in the future if the need arises. Thanks!!!"
Before starting
Installed 5 palms for a customer in there backyard
Before I ever broke ground
During project
Clearing 1 acre

+12

Response time3 days
1 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for MDCG Metropolitan Design
MDCG Metropolitan Design
4.3(
56
)
Landscape - Minor Grading or Resloping

Serving Greenville, FL and surrounding areas

Approved

In business since 2001

Free estimates

Emergency services offered

"My experience with MDCG was the greatest. The owner was very professional, honest and very friendly. For the work he completed, the price was reasonable. Now, for any of my irrigation needs or water leaks in my yard, I call MDCG and no other company."
CMDP Program Certification
Sodding Project
Grading for Asphalt Driveway
Landscape Hardscape Pavers
Before Landscape Hardscape

+2

Response time8 hrs
Response rate91%
3 neighbors recently requested a quote
Lancore LandSolutions
New to Angi
Building Site - Preparation and ClearingExcavation - Major Grading or Resloping

Serving Greenville, FL and surrounding areas

Approved

Hey everyone, my name is Hudson Lott. I recently started my own land clearing business and I’m working hard to build a name for myself and my company.\n\nI spent the last 6 years working for other land clearing businesses before deciding to take the leap and go out on my own. I’ve learned a lot over the years, and now I’m putting that experience into my own business.\n\nI take a lot of pride in my work and always strive to leave every property looking right and make sure the landowner is happy with the job. I believe in doing honest work, taking care of my customers, and treating every job like it matters.\n\nI’m just getting started, but I’m excited to see where this business goes. If you or someone you know needs land clearing or property cleanup, I’d appreciate the opportunity to earn your business.

5 neighbors recently requested a quote
...
Showing 1-10 of 78
Excavating questions, answered by experts

In the United States, a depth of 36 inches (three feet) for underground water lines is the accepted industry standard. This depth varies from location to location based on local conditions. In areas with colder winters, they may be buried deeper to prevent frozen well water pipes : This is usually at least six inches below the frost level. The International Plumbing Code calls for a minimum of 12 inches below grade.

While you can save some money by digging your own pool, you may end up paying more in construction equipment rental fees in the long run. You could, however, focus your DIY energies on lowering the cost of leveling your lawn for your pool or filling in surrounding landscaping after construction.

You can dig 60 to 80 linear feet by hand per day depending on the depth. Digging a 100-foot trench by hand will take you two work days, but it can take longer if you have heavy or rocky soil. If you’re digging a deep trench or one that’s over 100 feet, consider renting a mechanical trencher, such as a walk-behind or ride-on, or calling a pro for help. 

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

If you’re planning to dig on your property, you’ll need to check for underground utility lines. Call the national call-before-you-dig 811 number. Once connected to an operator, you can schedule a site visit to mark underground lines. This way, you won’t accidentally dig into pipes and can cause major (read: costly) issues.

The Greenville, FL homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.