Top-rated subcontractors.

Get matched with top subcontractors in Fort Meade, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Fort Meade, FL?

Select your specific project to find the pro for you.

TRUSTED BY FORT MEADE, FL HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon523
    Verified subcontracting services reviews

Find Subcontractors in Fort Meade

Avatar for National HomeCraft LLC
National HomeCraft LLC
4.5(
191
)
Major Home Repairs (General Contractor)

Serving Fort Meade, FL and surrounding areas

In business since 1967

Free estimates

Emergency services offered

"Everyone at Solar Shield was very nice and professional. We had a few concerns when the moisture barrier was installed and we still had rain in our bedroom. Frank got it corrected the next day, and finished the roof the following week. The good news: very nice looking roof with no more leaks. The bad news: we got pictures of the hurricane straps installed and had the roof inspected by our insurance company. They found that the hurricane straps installed were not up to their standards and neither was the moisture barrier. They also found multiple slats (we didn’t have decking that covered the whole roof - old house) that were split and compromised during the work, so we were unable to qualify for any insurance discounts. Overall, we have a nice looking roof - top of the line from Solar Shield Industries. Hopefully, it will last a lifetime. But unfortunately, we have some decking remediation that needs to be done and we still need hurricane straps, which will probably be clips now. Not a big enough deal for me to raise a stink. I can retro clips and repair the few decking issues from the attic & under siding. And apparently, the moisture barrier is just not what the insurance company accepts as a “moisture barrier.”"
All of the doors and windows were replaced by National HomeCraft.
Shower Replacement
The customer wanted a custom pattern created with the vinyl siding.
Metal shingles that look like real clay tiles. The color will last forever and the shingles will stand up to 200mph winds!
Shower with concrete wall pattern and black fixtures

+11

Recommended by97%of homeowners
Avatar for CER Design Build
CER Design Build
4.8(
21
)
Major Home Repairs (General Contractor)

Serving Fort Meade, FL and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"Cer Custom Renovations did an excellent job on a complex remodel. Jose was professional, accommodating, and produced an outstanding result. We recommend them and would use them again. No project this complex is without hiccups, but when they happened Cer Custom Renovations came through. Well done."
Custom cabinets
Chefs kitchen
Master bath
Theater
Additional Photos

+22

Recommended by95%of homeowners
...
Showing 1-10 of 270
Subcontractors questions, answered by experts

Mediterranean architecture comes from traditional building styles of countries on the Mediterranean Sea mixed with French, Greek, and Moroccan influences. There are three main types of Mediterranean architecture: Italian Renaissance, Spanish Revival, and modern.

Some signature components of Mediterranean architecture include red terra cotta roofs, archways, stucco siding, and metal detailing on windows. These homes often have balconies and outdoor living areas.

A designer is a great choice for remodeling projects that don’t require significant structural work. For remodeling that includes structural work like removing load-bearing walls, altering exterior walls, or adding on a room, an architect can design and execute the renovations while ensuring your home remains structurally sound.

You likely need to hire an architect for your new house design and build, unless you have the design skills and experience with building regulations and standards needed to get your plans approved. If you are able to meet the design requirements, you can hire a draftsperson to create the blueprints for the builders to follow.

Designs typically take 2-6 months, depending on factoring, project size, and customization needs. Larger or more complex designs may require additional time for approval and revisions.

If your project is complex, it may make sense to hire an architect to draw plans. An architect might also be a good person to hire if you want to ensure your plans adhere to building codes and regulations.

The Fort Meade, FL homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.