Top-rated pool table assembly pros.

Get matched with top pool table assembly pros in May Valley, CO

Enter your zip and get matched with up to 5 pros

Need a pro for your pool table assembly project in May Valley, CO?

Select your specific project to find the pro for you.

Find Pool table assembly pros in May Valley

Avatar for DJ Services and Home Repair, LLC
DJ Services and Home Repair, LLC
4.2(
17
)

Serving May Valley, CO and surrounding areas

In business since 2012

Free estimates

Emergency services offered

"Remodeled kitchen. The work he did was OK. I wanted a contract. Kept asking for one. He showed up with the contract the day I paid him. Kept having to call to see when he would show up to work again. He would tell me and sometimes he would not show up or call. Took them 2 1/2 months to finish. The appliances were on backorder. They were not in by the time he finished, except for a few things like cleaning paint splatter, and caulking. He said he would come back and install appliances and finish up. Appliances were delivered and two weeks later I was still calling to see when he would come back. He would not say. I was telling him on the phone that I would hire someone else and he hung up on me. I called and left a message telling him that this is business and if he has the courage to call back in the next two or so days, it is fine. Otherwise, I am hiring someone else. He never called me."
Trimming Trees and Removing Bushes
Replaced the whole deck
Setting in the new post.
Trimming Trees and Removing Bushes
Replaced the whole deck

+82

Response time1 day
Recommended by76%of homeowners
D & D Contracting
5.0(
1
)

Serving May Valley, CO and surrounding areas

In business since 2015

Free estimates

We're a locally owned and operated company that values honesty, integrity and treats your home as if it were our own. We offer a variety of general contractor home improvement services that are customizable to each individual project. We specialize in additions and kitchen remodels but also offer a wide range of expertise for a variety of other projects. We pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building lasting relationships and guarantee your satisfaction!

Response time4 days
Response rate100%
TLC Remodeling
New to Angi

Serving May Valley, CO and surrounding areas

In business since 2002

Free estimates

TLC Remodeling is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade, combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Showing 1-10 of 28
Pool Table Assembly questions, answered by experts

Losing some water from splashing and evaporation is normal. However, if you notice a rapid drop in the water level or are adding water more frequently than usual, you might have a leak. Other common signs of a pool leak include:

  • Unexplained soft, mushy, or wet spots in the yard.

  • Cracks in the pool's structure or falling tiles.

  • Higher-than-normal water bills.

  • Persistent algae growth or water discoloration.

  • Standing water near the pump, pipes, or other pool equipment.

Building a pool yourself will take at least eight to 12 weeks. After all, this is the building timeline after hiring a pool contractor who knows how to draw up plans, analyze your landscape, and apply for proper permits. If you choose to tackle any part of the process alone, assume building a pool will take two to three months at a minimum.

The type of sand you need for your sand filter depends on the manufacturer’s instructions, but you’ll need to use sand specifically for pool filters. Silica sand is a wallet-friendly, common choice that’s relatively easy to replace. You’ll choose between various grades of sand and different-sized sand grains.

The most expensive part of building a pool is typically the excavation and labor, which can account for 25% to 50% of the total project cost. This is particularly true for inground pools that require significant excavation, potentially including the rental of large equipment, and extensive construction labor. In contrast, above-ground pools are generally less expensive as they typically do not require excavation and can be installed much more quickly. Concrete in-ground pools are among the most labor-intensive options.

If you want your pool to be ready for summer, spring is the perfect time to put in an inground pool. However, if you are concerned about cost and are looking to save money, you can wait until fall and winter, when some companies may offer discounts on pools and pool materials.

The May Valley, CO homeowners’ guide to pool table assembly services

From average costs to expert advice, get all the answers you need to get your job done.