Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Pleasant Grove, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Pleasant Grove, CA?

Select your specific project to find the pro for you.

TRUSTED BY PLEASANT GROVE, CA HOMEOWNERS

  • Average homeowner rating star icon4
    Average homeowner rating
  • Verified reviews icon13
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Pleasant Grove

Avatar for Sacramento Paving Inc.
Sacramento Paving Inc.
4.6(
21
)
Asphalt Paving - InstallAsphalt Paving - Repair or PatchAsphalt Sealing+1 more

Serving Pleasant Grove, CA and surrounding areas

Approved

In business since 2017

Free estimates

Warranties offered

"“I recently had my driveway paved by Sacramento Paving Inc., and I couldn’t be happier with the results. Jake was incredibly helpful throughout the entire process. Highly recommend their services!”"
Asphalt driveway
Asphalt driveway
Additional Photos
Additional Photos
Additional Photos

+27

Response time3 days
9 neighbors recently requested a quote
Recommended by70%of homeowners
Avatar for All About Asphalt
All About Asphalt
4.3(
20
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Sealing+1 more

Serving Pleasant Grove, CA and surrounding areas

Approved

In business since 2017

Free estimates

Emergency services offered

"We had to do one reschedule, but Sammy showed up on time and was finished sealing my driveway right on time. They did a meticulous job of prepping and sealing the cracks in the driveway. Very happy with their work."
Some of our work
Some of our work
Some of our work
Some of our work
Some of our work

+85

Response time2 days
Response rate96%
7 neighbors recently requested a quote
Avatar for Bay Valley Paving
Bay Valley Paving
4.6(
7
)
Asphalt SealingAsphalt Paving - InstallAsphalt Paving - Install- For Business+1 more

Serving Pleasant Grove, CA and surrounding areas

Approved

In business since 2014

Free estimates

Emergency services offered

"Tim showed up on time.we have a fairly large driveway that was in rough shape.we went with bay valley they did a excellent job .every few years we have work done on our driveway.this is the best it's ever looked. They also did my neighbor's driveway and they are very happy.very professional"
Driveways - Asphalt Project
Driveways - Asphalt Project
Driveways - Asphalt Project
Driveway
Driveway

+26

Response time4 days
Response rate100%
5 neighbors recently requested a quote
Avatar for Ridgeway Construction, Inc.
Ridgeway Construction, Inc.
4.7(
16
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Pleasant Grove, CA and surrounding areas

Approved

In business since 2020

Free estimates

Emergency services offered

"Michael's bid was very thorough and professionally done and the price seemed very reasonable. He arrived on time and did not waste any time. He worked well with us on a couple of adjustments during the job - and even did a little extra to help us out. He was very careful and thorough in his work -- and cleaned up the site very neatly."
Response time1 day
Recommended by100%of homeowners
Avatar for UNITED CONCRETE
UNITED CONCRETE
4.4(
20
)
Concrete Driveways - Install

Serving Pleasant Grove, CA and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

"The concrete work they did appears to be very good, as it was a driveway and drainage is a must, I'll know when it rains. Demo was good. Prep. was good-- lots of rebar--. My only problem with the company was the after work cleanup and the repair of a broken sprinkler line which has not happened as yet."
Concrete
Concrete
Concrete
Response time2 hrs
Response rate100%
3 neighbors recently requested a quote
...
Showing 1-10 of 171
Asphalt Driveways questions, answered by experts

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

Gravel is one of the few driveway materials that can handle rain the second it’s installed. Unlike asphalt, which needs days to set, or concrete, which requires weeks to cure, gravel is ready as soon as it’s compacted. It’s naturally permeable, allowing water to drain straight through—with no risk of pooling or surface damage. Gravel driveways are one of the most affordable, at $1 to $3 per square foot, and can also last upward of 100 years.

Asphalt driveways last anywhere from 15 to 30 years, but if you don’t stay on top of repairs, you may find yourself spending extra to replace your driveway before its typical lifespan. Stay on top of repairing cracks and potholes by routinely inspecting your driveway once or twice a year. It’s a good idea to pressure wash your asphalt driveway at least once a year to keep it clean. Apply a sealer every one to five years, based on your climate.

The decision to repair or replace your driveway depends on the extent of the damage. If your driveway has a few small cracks, a simple repair will do the trick. If you see larger cracks and potholes, it may be time to consider resurfacing or replacement. Resurfacing is a great option if more than 25% of the surface is damaged, but if the damage is extensive—deep cracks or significant sinking—it’s best to replace the driveway entirely. A new driveway, with proper care, can last decades while patching or resurfacing might only hold up for a few years before needing more attention.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Pleasant Grove, CA homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.