Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Paradise, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Paradise, CA?

Select your specific project to find the pro for you.

TRUSTED BY PARADISE, CA HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon55
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Paradise

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,689
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Paradise, CA and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Avatar for Elite Spa Start Up
Elite Spa Start Up
5.0(
3
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Paradise, CA and surrounding areas

In business since 2022

Free estimates

Credit card accepted

We provide seasonal hot tub start up to get your hot tub chemically balanced and ready for use. We also offer weekly, biweekly, and monthly services. \n\nWith a background of many years in hot tub industry, we know how to balance chemicals. Much better than a pool service.

Hot Spring Jetsetter with salt system
After
Before #2
Before
Before #1

+2

Recommended by100%of homeowners
Install Above Ground Pools questions, answered by experts

Draining a pool with a garden hose can take between eight and 14 hours depending on the depth of your pool and whether you use a sump pump. Be sure to stay close to the pool during this time to ensure the structure of your pool remains unharmed and that the water drains properly.

A stock tank pool is far cheaper than an in-ground pool. Installing an inground pool costs $55,000 on average, while a stock tank pool costs around $945 to install.

Yes, too much chlorine can make your pool cloudy, especially after you have recently shocked it. However, low chlorine levels are a more common cause of cloudy water. An imbalance in pH or an excess of any chemical can also lead to cloudiness. To determine the specific cause, you should test your pool water to check the levels of chlorine, pH, and other chemicals. Regular maintenance is essential for keeping your pool clean and clear.

Yes, adding a pool to your property will almost always increase your homeowners insurance premiums. This is because pools are considered a greater liability due to their potentially hazardous nature, and the added replacement cost of the pool is factored into your home's rebuilding cost when considering coverage limits. The amount of the increase can range from as little as $50 to a few hundred dollars more per year, depending on your insurance provider, location, current coverage, and the safety features installed. Before building a pool, it is highly recommended to contact your insurance agent to get an estimate, discuss their specific guidelines and requirements, and factor the increased premium into your total pool installation costs.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Paradise, CA homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.