Top-rated basement remodelers.

Get matched with top basement remodelers in Chandler, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Chandler, AZ?

Select your specific project to find the pro for you.

TRUSTED BY CHANDLER, AZ HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon13
    Verified basement remodels reviews

Find Basement remodelers in Chandler

Avatar for Shepherd Contracting
Shepherd Contracting
5.0(
15
)
Basement - Remodel

Serving Chandler, AZ and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"Shepherd Contracting goes above and beyond- Thomas and his team were polite, efficient, and did outstanding work on a home remodel for a design client. My client and I were thrilled with the quality and attention to detail. An added bonus-they finished on time and within the budget!"
My jobs
My jobs
My jobs
My jobs
My jobs

+40

4 neighbors recently requested a quote
Avatar for R and A Remodel and Demolition LLC
R and A Remodel and Demolition LLC
3.7(
55
)
Basement - Remodel

Serving Chandler, AZ and surrounding areas

Approved

In business since 2007

Free estimates

Emergency services offered

"Albert and his extended team did a fantastic job fully to our expectations. If you are looking for someone who can offer advice, has a realattention to detail , and can work on all facets of a remodel job, then this is your man. I would say no job is too big and with the skills he has and his wider team can bring you'll get the job completed in no time. Top Class."
Bathroom Remodel
Bathroom Remodel
Bathroom Remodel
Kitchen Remodel
Bathroom Remodel

+185

Response time9 hrs
1 neighbors recently requested a quote
Recommended by92%of homeowners
Avatar for Covenant Custom Builders LLC
Covenant Custom Builders LLC
New to Angi
Basement - Remodel

Serving Chandler, AZ and surrounding areas

Approved

Free estimates

Small jobs welcome

Credit card accepted

Covenant Custom Builders LLC is a General Contractor licensed with a KB-1 Dual License for residential and commercial projects. We “Build What Matters” with over 50 years of combined trustworthy experience.

2 neighbors recently requested a quote
Avatar for West Valley Remodeling LLC
West Valley Remodeling LLC
5.0(
11
)
Basement - Remodel

Serving Chandler, AZ and surrounding areas

Free estimates

"Mark did a excellent job on my backsplash..He was professional..courteous..and explained everything he was doing in detail so that there were no surprises. I highly recommend Mark and his company for any remodeling work needed."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+4

Recommended by100%of homeowners
...
Showing 1-10 of 111
Basement Remodel questions, answered by experts

Costs are guided by renovation scope, materials chosen, project duration, structural needs, and labor. Prioritizing tasks prevents unforeseen expenses.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.

Permits may be required for major repairs, structural work, or electrical and plumbing restoration after a flood. Check with your local building department to determine permit requirements and associated fees for your flooded basement cleanup project. Obtaining the correct permits helps ensure work is done safely and up to code.

Yes, most general contractors require an initial down payment, typically between 10% and 25% of the total project cost. This upfront payment helps cover the costs of materials, permits, and subcontractors. The remaining project costs are usually billed after specific project milestones are reached or on set completion dates, as outlined in your contract. Be wary of contractors who require a significant deposit of 50% or more upfront, as this could be a red flag for a scam.

The Chandler, AZ homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.