Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Waldo, AR

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Waldo, AR?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Waldo

Avatar for David's Affordable Asphalt
David's Affordable Asphalt
4.7(
18
)

Serving Waldo, AR and surrounding areas

Approved

In business since 2000

Free estimates

Emergency services offered

"David and crew did an absolutely amazing job on my driveway. It was a smaller job but he had the equipment to handle it. He was upfront on cost, his crew was very respectful and pleasant to deal with. I would not hesitate to recommend him. Five stars is not enough for a rating."
saw cut and base repair
Hot mix asphalt patching
Driveway base
Driveway Paving
Driveway Paving

+1

Response time2 days
24 neighbors recently requested a quote
Recommended by87%of homeowners
Precision Seal Coating and Striping
New to Angi

Serving Waldo, AR and surrounding areas

Approved

In business since 2021

Free estimates

Offers commercial services

We take great pride in our experience, expertise, quality and customer service that\nwe provide to meet your needs. It is our mission to provide excellent workmanship\nand complete customer satisfaction from start to completion of a project. \nIn order to understand the needs and expectations of our customers,\nwe take great care to work and communicate with every customer a professional manner.\nOur reputation is based on service, safety and quality, regardless of how large\nor small the job.

Church Parking Lot
2
3
4
5

+6

Response time2 days
33 neighbors recently requested a quote
Avatar for Tony's Paving
Tony's Paving
5.0(
2
)

Serving Waldo, AR and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"I’ve hired Tonys Paving on numerous occasions! Tony and his crew is a great company, they do exactly what they say they’ll do. I will definitely hire them again when the necessity arises!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+12

Recommended by100%of homeowners
Showing 1-10 of 28
Asphalt Driveways questions, answered by experts

Even with regular maintenance, most driveways don’t last much longer than 30 years. Alligator cracking is a clear warning sign that your driveway’s foundation is failing, and cracks that are deep and wide can let water in, causing more damage. Standing water is another red flag. If your driveway doesn’t drain properly, it’s going to degrade slowly. Finally, if you’re seeing dips or uneven patches, that’s a sign the base layer or soil is shifting. If these issues pop up, it’s time to replace your driveway.

Recycled asphalt is not better than gravel, but can be a good alternative. It is inexpensive, but not as low-cost as gravel, and doesn’t tend to last as long. Recycled asphalt isn’t as dusty as gravel and is more environmentally friendly. The black look can be something that homeowners prefer. No matter what, ensure you choose an experienced recycled asphalt contractor. 

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

In terms of durability, concrete driveways can last more than 50 years when properly maintained, compared to the typical 30 years for an asphalt driveway. However, the durability depends on the climate, base material and thickness, and thickness of the concrete or asphalt used. The longevity of concrete or asphalt driveways also depends on how well it’s maintained and the amount of wear and tear it endures.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The Waldo, AR homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.