Top-rated rototilling pros.

Get matched with top rototilling pros in Rose Bud, AR

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Rose Bud, AR?

Select your specific project to find the pro for you.

Find Rototilling pros in Rose Bud


Rototilling questions, answered by experts

For minor unevenness, you don't necessarily need to remove grass before leveling. You can apply a topdressing mixture to fill in low areas and even out the surface. However, for more significant unevenness or deep depressions, it might be necessary to temporarily remove the grass to ensure proper leveling and soil compaction. After filling and leveling, you can replace the grass or consider reseeding the area.

Yes, such as sod installation and erosion control for comprehensive site improvement.

Yes, you can rent a rototiller for around $60 per day and do the work yourself, but it’s not recommended. Tilling is more of an art than a science, as tilling too deep can be detrimental to your soil structure and the organic matter that is beneficial to plants and shrubs, and tilling too shallow won’t properly introduce fertilizer or break up the soil for rooting plants. Additionally, tillers are powerful machines with sharp blades to cut through small roots and soil, so they are inherently dangerous to use. It’s usually worth it to hire a professional rototiller.

It depends on the model of your pool. You’ll always have to level the topsoil, but most vinyl-lined pools require an additional 1- to 2-inch layer of sand to protect the liner. This way, when a foot kicks down to the bottom of your pool, it’s not scraping the liner against the hard ground. If your pool isn’t vinyl-lined, you can skip this step or add a layer of another base material, like decomposed granite. Always check your manufacturer’s instructions before you begin.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.