Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Quitman, AR

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Quitman, AR?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Quitman

Avatar for Performance Coatings
Performance Coatings
4.5(
14
)

Serving Quitman, AR and surrounding areas

Approved

In business since 2016

Free estimates

Warranties offered

"I would have given them a 5 star rating but I had a few spots get messed up on my drive way where you can tell it was thinner. When I asked about them fixing it he said he didn’t do small jobs. I asked for Johnny to come out and look at it he said he would. It’s been weeks now and he won’t he hasn’t came out like promised. Johnny won’t even answer my phone calls. I’m very disappointed that this is how they are treating a customer. It shouldn’t matter if it’s a big job or a little one. If you can tell in the picture that was sent that the asphalt was thinner in a spot you should guarantee your work and come fit it. I even said if I have to pay I will since I did have workers out to take out a tree and their truck was what caused damage. But Johnny even agreed that sometimes the machine can give out a thinner layer like what was caused in this situation so why won’t he come fix it? So I would go else where to get your asphalt done. My neighbor got his done as well so I’m including the whole price since since it’s all tied together bc our driveways join together."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+32

3 neighbors recently requested a quote
Recommended by78%of homeowners
Asphalt Driveways questions, answered by experts

Depending on project size, typically 1 to 3 days, including preparation and installation.

Driveway aprons typically range between four and seven inches thick, though your town's building codes will likely have specific requirements. Additionally, you may need to add a layer of permeable aggregate in the excavation below your paved apron to ensure proper stormwater drainage.

Driveways should be sloped with a minimum 2% slope—anything lower will cause precipitation and runoff to collect. A 2% slope is the equivalent of a 2-foot rise over 100 feet. One quick way to check the integrity of your driveway’s slope: no more than four inches of water should collect on the surface longer than 15 minutes after rain.

If you’re looking for a similar, eco-friendly driveway material, you might consider one of these options:

  • Permeable pavement: This material is sometimes called “pervious” or “porous” pavement; it allows stormwater to drain into the subbase, eliminating storm drain costs. 

  • Gravel: Consider paving your driveway with locally sourced gravel. By sourcing from a nearby source, your money won’t fund international shipping and will be invested back into your local community.

  • Natural stone pavers: Because natural stone pavers are made from organically-produced stone, there’s no new manufacturing required, limiting the environmental impact. In addition, water easily flows and drains through the gaps in the pavers.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The Quitman, AR homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"