Top-rated excavation pros.

Get matched with top excavation pros in Kensett, AR

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Kensett, AR?

Select your specific project to find the pro for you.

Find Excavation pros in Kensett

A+ Landscaping
New to Angi

Serving Kensett, AR and surrounding areas

In business since 2007

Free estimates

A+ Landscaping, is the premier professional land care, lawn care and excavation company offering a wide variety of residential and commercial services to our clients in Searcy and surrounding areas. We are known to pay exquisite attention to detail while making your satisfaction our number one priority.\nPlease call us today to schedule your appointment with Arkansas' true professionals at work for you!\n\n

Showing 1-10 of 16
Excavating questions, answered by experts

Most residential basements are 8 to 10 feet deep. You can dig deeper depending on building codes, but it does become more difficult. You’ll likely need to install stronger foundation walls and additional supports to handle the increased load. Depending on the water table, you may also need a water management system. Clay soil can support a deeper foundation than sandy soil. A structural engineer will be able to tell you the maximum, feasible depth.

You can dig 60 to 80 linear feet by hand per day depending on the depth. Digging a 100-foot trench by hand will take you two work days, but it can take longer if you have heavy or rocky soil. If you’re digging a deep trench or one that’s over 100 feet, consider renting a mechanical trencher, such as a walk-behind or ride-on, or calling a pro for help. 

Prior to excavation, you should prepare the dig site and call 311 before you sign anything.

To get your site ready for excavation, you should move anything in the area that isn’t affixed to the land. You can save money on the excavation by removing hardscaping, including walkways, decks, concrete patios, and paver patios.

Before you carry out any digging, you should call 311 to confirm that there are no utility lines running through your excavation site. Skipping this step could lead to severe injury and property damage if your excavator hits a water, sewage, or gas line.

To drill a shallow well, you may be able to use a drive well point. This is a tapered point that is driven into the ground. A drill bit at the end of PVC pipe may be another option to consider. A lot of the cost depends on what tools are available near you.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

The Kensett, AR homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.