Top-rated excavation pros.

Get matched with top excavation pros in Kensett, AR

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Kensett, AR?

Select your specific project to find the pro for you.

Find Excavation pros in Kensett

A+ Landscaping
New to Angi

Serving Kensett, AR and surrounding areas

In business since 2007

Free estimates

A+ Landscaping, is the premier professional land care, lawn care and excavation company offering a wide variety of residential and commercial services to our clients in Searcy and surrounding areas. We are known to pay exquisite attention to detail while making your satisfaction our number one priority.\nPlease call us today to schedule your appointment with Arkansas' true professionals at work for you!\n\n

Showing 1-10 of 16
Excavating questions, answered by experts

It can take several weeks for the ground to settle after removing a tree, and the soil under larger, more mature trees can take months. The deeper the tree has been ground under the soil, the longer it will take to settle. However, this extra depth can help you plant new landscaping sooner because you’ll have more space for fresh soil.

Because decomposed granite is a durable material, a crushed rock or gravel base is optional as long as the DG is properly installed and compacted. However, installing a base is a good idea because it will ensure proper drainage and stability and act as a weed suppressant (although you may still occasionally have to pull weeds). Installing an adequate base can also increase the durability of driveways and walkways. If you forego the paver base or gravel underneath, line the area with landscaping fabric to avoid weeds.

Excavation is priced in cubic yards, so you’ll need to find the volume of the area in order to calculate costs. Multiply the length, width, and proposed depth of your excavation site, then convert it into yards to get the volume. Multiply this figure by the price per cubic yard.

Most homeowners can measure by hand to get a rough estimate, even if it’s tedious. You may want to pull out a tape measure or use a string to help mark the area.

You do not have to dig footers for a deck as long as it meets local code and holds up to weather in your area. If you live somewhere that experiences high winds and earthquakes, you may need to dig for your deck posts. Deck blocks, post anchors with base plates, and helical pile systems are the three no-dig deck post options you can choose from if local code permits.

Chipmunks dig their burrows about three feet deep and up to 30 feet long. The entrances can be two inches wide or more. Chipmunks are fiercely protective of their burrows and use them to protect the nuts and seeds they gather for the long winters.

The Kensett, AR homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.