Top-rated excavation pros.

Get matched with top excavation pros in Bradford, AR

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Bradford, AR?

Select your specific project to find the pro for you.

Find Excavation pros in Bradford

Perdew Excavating
1.8(
3
)
Excavation - Major Grading or ReslopingLandscape - Minor Grading or Resloping

Serving Bradford, AR and surrounding areas

In business since 2010

Free estimates

Credit card accepted

"They are very good in working the soil above a septic field with a very good feel for what is happening to the soil, that is whether to stop or continue working. They do a good job in clearing according to what the owner wants and needs/ They are friendly and work responsiblely."
Response time4 hrs
Recommended by50%of homeowners
Final Touch Lawn & Landscaping
New to Angi
Landscape - Minor Grading or Resloping

Serving Bradford, AR and surrounding areas

In business since 2010

Free estimates

We have over 10 years of experience in the business. Here at Final Touch Lawn & Landscaping we pride our company on reliability, great communication, integrity, and quality work. We are experts in our trade and will do our best to keep you as educated as we can on your particular task or project. We look forward to earning your business!

Flower bed before and after
before and after
before and after
prepping the yard to lay sod
before and after

+1

Showing 1-10 of 15
Excavating questions, answered by experts

Trenches are typically 12 to 24 inches deep and 8 inches wide. However, the required depth depends on the specific project and local ordinances. For example, a French drain may need to be 18 inches deep, while a water pipe might require a depth of 24 inches and a drainage pipe 36 inches. Your city or county may have specific regulations, so it's wise to consult with an excavation professional to determine the correct depth for your project.

You do not have to dig footers for a deck as long as it meets local code and holds up to weather in your area. If you live somewhere that experiences high winds and earthquakes, you may need to dig for your deck posts. Deck blocks, post anchors with base plates, and helical pile systems are the three no-dig deck post options you can choose from if local code permits.

Depending on the severity of the freeze and the method used, thawing frozen underground pipes can take anywhere from 30 minutes to several hours. Applying heat directly to the pipe using heat tape, infrared lamps, or hot water jetting can speed up the process. However, patience and careful monitoring are key to avoiding pipe damage.

Concrete blocks are the cheapest way to base a shed. However, the space in between allows critters to go under, burrow, and even damage your shed’s frame. For a more pest-proof option, consider building a shed base with gravel or paver stones. Both options are fairly affordable and easy enough for a DIY project. For gravel, you can build a wooden frame to contain the loose material.

Above ground pools are not buried in the ground. Typically, above ground pools are semi-permanent. One reason they’re more affordable is that you don’t have to dig for an inground pool and pour concrete or another material. However, you can choose to install a semi inground pool, which is a hybrid between the two.

The Bradford, AR homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.