Top-rated subcontractors.

Get matched with top subcontractors in Townley, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Townley, AL?

Select your specific project to find the pro for you.

TRUSTED BY TOWNLEY, AL HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon37
    Verified subcontracting services reviews

Find Subcontractors in Townley

Complete Home Repair
4.9(
38
)

Serving Townley, AL and surrounding areas

In business since 1995

Free estimates

"Al was very kind and straightforward. He did initially tried to charge me a little more than the average for the area but after I explained that I had done research for the labor costs and already have materials he got the cost significantly also mention that you found him on Angie's List. I am very pleased with how the floor looks they did a very quick job some very weird layouts because my house is strange though I love its eccentricity. Though it takes a long time to book him because he is usually busy he works very fast, but not sloppily, and the work was completed in approximately 4 days with a small crew of three one of whom was his son. we are almost done with most of our work but I'm a call him back for some minor repairs thing that needs to be completed the only complaint I have is that at least one of the workers is a smoker and I found a few cigarette butts in my yard or in the bushes next to where they were sawing which was not very pleasant. That is a minor complaint though because as contractors go they show up on time and they get the work done and they get the work done well; which, I don't know if you use very many contractors, is unusual and a good thing. Overall I would use them again in a heartbeat and I would suggest them to other people.
"
luxury
warmth
durable
Recommended by93%of homeowners
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)

Serving Townley, AL and surrounding areas

In business since 1992

Free estimates

"There were some unforeseen delays due to contractors family death & a hospitalization but the workers knew how to do anything that was needed. I was very pleased with the workmanship & overall job."
Dream Baths

+15

Recommended by82%of homeowners
Juan Garza Masonry and Concrete
4.6(
13
)

Serving Townley, AL and surrounding areas

In business since 2020

Free estimates

Credit card accepted

"Work started when promised. Hard fast workers. Moved quicker than I thought. Actual pour was delayed due to a concrete truck malfunction, but when delivery was rescheduled, they worked to finish before dark. This was not an issue or inconvenience for me. Very happy with the way it turned out and how they tied it in to my current drive that was on a slope."
Concrete Pouring and Repair Project
Recommended by100%of homeowners
...
Showing 1-10 of 51
Subcontractors questions, answered by experts

A split-level home is one that has several staggered floors connected by short staircases, while a split floor plan separates the primary bedroom from the rest of the bedrooms. Split floor plans are most often found in single-story homes, while split-level homes are always at least two stories.

Mediterranean architecture comes from traditional building styles of countries on the Mediterranean Sea mixed with French, Greek, and Moroccan influences. There are three main types of Mediterranean architecture: Italian Renaissance, Spanish Revival, and modern.

Some signature components of Mediterranean architecture include red terra cotta roofs, archways, stucco siding, and metal detailing on windows. These homes often have balconies and outdoor living areas.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

You can draw your own house plans using three-dimensional modeling software, but in most cases, you’ll need an architect to draw up the final plans. Architects understand local building regulations and requirements, so their plans will be necessary for getting permits approved, and they’ll also ensure your home is structurally sound. DIY house plans can be a good place to start to help visualize your project, but you should always defer to a professional before trying to proceed with the project.

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

The Townley, AL homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.