Top-rated subcontractors.

Best subcontractors near Haleyville, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Haleyville, AL?

Select your specific project to find the pro for you.

TRUSTED BY HALEYVILLE, AL HOMEOWNERS

  • Average homeowner rating star icon5
    Average homeowner rating
  • Verified reviews icon11
    Verified subcontracting services reviews

Top-Rated Subcontractors in Haleyville - Updated Nov 2026

Avatar for Beta Pro Services
Beta Pro Services
5.0(
5
)
Major Home Repairs (General Contractor)

Serving Haleyville, AL and surrounding areas

Approved

In business since 2010

Free estimates

Emergency services offered

"Absolutely phenomenal! Luis and his crew were polite, honest, and professional. My husband and I have never experienced working with a contractor before, so we prayed for God to put the right people in our path, and He answered our prayers tremendously. We were clueless about materials and how much things should cost on average, but Luis guided us step-by-step. He and his crew built a second walk-in closet for our master bedroom. The work looks so professional, it looks as if the closet is a part of the house’s original design, very seamless! Part of our back porch was used for the space, and one of the living room windows had to be removed. We’re still in awe of how it looks like a window was never there! We plan on using BetaPro in the near future, and highly, HIGHLY recommend this business to anyone!!"
Electrical Project
Remodeling - Kitchen & Bathroom Project
Tree Service Project
Remodeling - Kitchen & Bathroom Project
Masonry Project

+43

Response time3 days
Response rate94%
7 neighbors recently requested a quote
Complete Home Repair
4.9(
38
)
Major Home Repairs (General Contractor)

Serving Haleyville, AL and surrounding areas

In business since 1995

Free estimates

"When my husbands work schedule changed allowing him to complete the work, Al was flexible about the change. I called and spoke to Al and he was gracious and understanding. Al performed everything as discussed and kept me informed as we went along. While the work was not needed, his service is great! I kept his card and plan to call him with future jobs."
luxury
warmth
durable
Recommended by93%of homeowners
Avatar for C&M Construction
C&M Construction
5.0(
9
)
Major Home Repairs (General Contractor)

Serving Haleyville, AL and surrounding areas

In business since 2024

Free estimates

Emergency services offered

"I could not be happier! When they say that they can do everything, they mean they can do everything! Great communication, great work in a very timely manner. I hired them to do a ceiling and insulation replacement for a rec room and ended up having them do all sorts of things. And I think it’s worth mentioning that I was comfortable leaving them alone at my house. Get your list together and call them."
Casteel Deck
Gerald and Linda's bathroom remodels
Casteel Deck
Casteel Deck
Mr.Creamers shower install

+24

Response time2 days
Response rate96%
Recommended by100%of homeowners
Showing 1-10 of 45
Subcontractors FAQs, answered by experts

Costs depend on desk size, labor, included features like drawers or motorized height adjustments, and required wall anchoring.

The process typically takes 2-6 weeks, depending on the project size and level of customization.

Buying a house is easier than building one from scratch. Buying an existing home is almost always faster, even if you need to make renovations once you move in. When you hire the right team to build a home, they will simplify the design and build phases so that there is little guesswork throughout the process, but building new construction will almost always take longer than buying an existing home.

The only real drawback to green building is that it’s more expensive up front, with per-square-foot prices sitting 33% higher than what you’d pay to build a traditional home. The higher cost is due to more expensive building materials and more labor to ensure every aspect of the home is as efficient as possible. However, green buildings often save money in the long run, so this is just a temporary downside.

While it’s never too early to start planning for a major home improvement project like a home addition, give yourself at least a month or two to plan and design your addition, find a contractor, and get the permits in order. For larger projects like a second-story addition that require designing with an architect, plan on three to four months of preparation.

The Haleyville, AL homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.