Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Headland, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Headland, AL?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Headland

Sgt. Stripes Asphalt Maintenance, LLC
5.0(
7
)

Serving Headland, AL and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

"Sgt. Stripes Asphalt did a fantastic job. I am in Kentucky and the job was in Georgia. They were very efficient, communicated with me. They did the job on the weekend so there would not be any traffic in and out of Post-Office parking lot. Their customer service and work great. I would definitely recommend them."
Response time1 day
2 neighbors recently requested a quote
Sgt. Stripes Asphalt Maintenance, LLC
5.0(
2
)

Serving Headland, AL and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

We are a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. We offer a variety of General Contractor services that are customizable to each individual project. You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships and guarantee your satisfaction!

Avatar for Holloway Land Restoration, LLC
Holloway Land Restoration, LLC
4.8(
13
)

Serving Headland, AL and surrounding areas

In business since 2022

Free estimates

"Paul was very efficient with both suggestions and performance. The driveway installed was completed in less time than expected even with several adjustments made. Every effort was made to insure that the driveway work was as needed and expected. Completely satisfied"
Holloway Pond
Holloway Pond
Holloway Pond
Holloway Pond
Before

+5

Response time10 hrs
Response rate96%
Recommended by100%of homeowners
...
Showing 1-10 of 97
Asphalt Driveways questions, answered by experts

Building a road on a slope requires careful planning and will normally require a drainage system underneath to prevent flooding and damage to the road over time. Your professional may lengthen your road to create switchbacks if the slope directly to your home is too steep, as there are regulations for maximum road slope. The drainage system will help prevent runoff from the higher side of the slope from damaging the asphalt or concrete. Keep in mind that building a road on a slope isn’t a good DIY project, as a lot can go wrong.

Asphalt is not a type of concrete. While both are a common type of pavement, asphalt is composed of aggregates (like sand and gravel) and bitumen; concrete is a mixture of cement, aggregates, and water. Here are some of the key differences between asphalt and concrete driveways.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Yes, it is possible to pave over an existing driveway, but whether it's the right choice depends on several factors. If the underlying structure of your current driveway is still strong, concrete or asphalt resurfacing can be a cost-effective way to prolong its life. However, if your driveway has significant issues like potholes, deep cracks, or other inconsistencies, it is best to remove the old driveway and start from scratch. Key factors to consider include the current driveway's condition, the compatibility of the new material, the added thickness and height, and the necessary surface preparation.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Headland, AL homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.