Top-rated asphalt driveway pros.

Best asphalt driveway pros near Abbeville, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Abbeville, AL?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Abbeville - Updated Nov 2026

Avatar for Elite Concrete
Elite Concrete
4.8(
38
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Abbeville, AL and surrounding areas

Approved

In business since 2007

Free estimates

Offers commercial services

"These guys are awesome. Sal and his team cleared sod, leveled, formed and poured a 500 square foot driveway with a retaining curb in one day. Concrete was perfectly jointed and finished. It was a pleasure doing business with Sal, and I couldn't be happier with the results."
OUR WORK
OUR WORK
OUR WORK
OUR WORK
OUR WORK

+9

Response time12 hrs
2 neighbors recently requested a quote
Recommended by94%of homeowners
Red Clay Contractors LLC
New to Angi
Gate for Driveway or Security - Install or Replace

Serving Abbeville, AL and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

My name is Clark Davis and I personally have 30 years of experience and take pride in running a customer service oriented business. We have a skilled workforce that is knowledgeable in everything we do as well as take pride in the work we are performing no matter the task. Fully licensed, insured and ready to serve your needs. Call 334-744-2809 for your free quote today or talk directly with are Foreman at 717-688-6177 for any scheduled tasks or quick questions. We Encapsulate, French Drains, Basement Waterproofing, Stabilization and leveling of floors, paint, install decks, and all other projects that may need done

Avatar for Isaiah's Handyman
Isaiah's Handyman
New to Angi
Concrete Driveways - Install

Serving Abbeville, AL and surrounding areas

Approved

In business since 2009

Free estimates

Credit card accepted

Isaiah's Handyman is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Flooring  site
Flooring  site
Flooring  site
Flooring  site
Drywall Patchwork

+2

5 neighbors recently requested a quote
Avatar for Holloway Land Restoration, LLC
Holloway Land Restoration, LLC
4.8(
13
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Abbeville, AL and surrounding areas

In business since 2022

Free estimates

"Paul was very efficient with both suggestions and performance. The driveway installed was completed in less time than expected even with several adjustments made. Every effort was made to insure that the driveway work was as needed and expected. Completely satisfied"
Holloway Pond
Holloway Pond
Holloway Pond
Holloway Pond
Before

+5

Response time10 hrs
Response rate96%
Recommended by100%of homeowners
...
Showing 1-10 of 80
Asphalt Driveways FAQs, answered by experts

Depending on project size, typically 1 to 3 days, including preparation and installation.

The decision to repair or replace your driveway depends on the extent of the damage. If your driveway has a few small cracks, a simple repair will do the trick. If you see larger cracks and potholes, it may be time to consider resurfacing or replacement. Resurfacing is a great option if more than 25% of the surface is damaged, but if the damage is extensive—deep cracks or significant sinking—it’s best to replace the driveway entirely. A new driveway, with proper care, can last decades while patching or resurfacing might only hold up for a few years before needing more attention.

It’s best to weigh the pros and cons of each material and decide on your priorities for your driveway. Gravel won’t be an appropriate choice if your driveway experiences heavy traffic. You’ll find that you need to level and top it off regularly, which could make the material a much more expensive option.

Think of the street as a way to capture all the elements on either side of the road, including the road—a street encompasses the homes or other buildings, the trees, and the road of a given area as defined by the beginning and end of the street on a map. A roadway, however, is the component of the street where cars travel.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The Abbeville, AL homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.