Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Newton, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Newton, AL?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Newton

Avatar for Elite Concrete
Elite Concrete
4.8(
38
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Newton, AL and surrounding areas

Approved

In business since 2007

Free estimates

Offers commercial services

"These guys are awesome. Sal and his team cleared sod, leveled, formed and poured a 500 square foot driveway with a retaining curb in one day. Concrete was perfectly jointed and finished. It was a pleasure doing business with Sal, and I couldn't be happier with the results."
OUR WORK
OUR WORK
OUR WORK
OUR WORK
OUR WORK

+9

Response time12 hrs
1 neighbors recently requested a quote
Recommended by94%of homeowners
Avatar for Flores Concrete
Flores Concrete
5.0(
2
)
Concrete Driveways - InstallConcrete Driveways & Floors - Install- For Business

Serving Newton, AL and surrounding areas

Approved

In business since 2021

Free estimates

Warranties offered

"Really like the work and service they provide Mr Flores did exactly what I wanted. He’s very on time, respectful and very professional at what he does. If I ever need anything fixed or remodeled I will definitely contact Mr. Flores again."
Concrete - Pouring & Repair Project
Driveways - Concrete Project
Concrete - Pouring & Repair Project
Driveways - Concrete Project
Driveways - Concrete Project

+8

Response time6 hrs
Response rate100%
7 neighbors recently requested a quote
Avatar for Isaiah's Handyman
Isaiah's Handyman
New to Angi
Concrete Driveways - Install

Serving Newton, AL and surrounding areas

Approved

In business since 2009

Free estimates

Offers commercial services

Isaiah's Handyman is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Flooring  site
Flooring  site
Flooring  site
Flooring  site
Drywall Patchwork

+2

Avatar for Holloway Land Restoration, LLC
Holloway Land Restoration, LLC
4.8(
13
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Newton, AL and surrounding areas

In business since 2022

Free estimates

"Paul was very efficient with both suggestions and performance. The driveway installed was completed in less time than expected even with several adjustments made. Every effort was made to insure that the driveway work was as needed and expected. Completely satisfied"
Holloway Pond
Holloway Pond
Holloway Pond
Holloway Pond
Before

+5

Response time10 hrs
Response rate96%
Recommended by100%of homeowners
...
Showing 1-10 of 103
Asphalt Driveways questions, answered by experts

Professionals restore the surface to a fresh, attractive finish by applying a new, even sealant layer.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Common alternatives to a gravel driveway include concrete, asphalt, brick, stone pavers, and permeable pavers. Concrete and asphalt are generally the most affordable options. However, concrete can be prone to cracking in cold climates, while asphalt may soften in areas with high heat and direct sun exposure. For enhanced curb appeal, brick, stone, and permeable pavers are popular choices, though their installation can be more expensive due to intricate designs. Stone pavers offer a natural look and are sometimes installed with gravel around them. Both permeable pavers and brick driveways provide excellent drainage, which helps prevent flooding and reduce water runoff.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

A driveway approach is the part of a driveway where the public road meets the private driveway. This section contains several key elements, including the driveway apron, the curb cut, and the end slope. Depending on the slope of the driveway, this area may also contain the trench drain.

The Newton, AL homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.