Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Kinsey, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Kinsey, AL?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Kinsey

Avatar for Elite Concrete
Elite Concrete
4.8(
38
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Kinsey, AL and surrounding areas

Approved

In business since 2007

Free estimates

Offers commercial services

"These guys are awesome. Sal and his team cleared sod, leveled, formed and poured a 500 square foot driveway with a retaining curb in one day. Concrete was perfectly jointed and finished. It was a pleasure doing business with Sal, and I couldn't be happier with the results."
OUR WORK
OUR WORK
OUR WORK
OUR WORK
OUR WORK

+9

Response time12 hrs
2 neighbors recently requested a quote
Recommended by94%of homeowners
Elite Bobcat & Concrete
3.3(
10
)
Concrete Driveways - InstallConcrete Driveways & Floors - Install- For Business

Serving Kinsey, AL and surrounding areas

Approved

In business since 2021

Free estimates

Customers say: Terrific value

"Was quick to respond, come out and quote, and inform us of his process. George called the concrete company so we would know the cost of concrete and gave us the cost of his labor. Crew showed up on time and completed the job in a timely manner. Followed up with completing the clean up and remainder of job. Job looks great and very happy with the service provided. Will absolutely consider again for any more concrete work."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+10

Response time12 hrs
12 neighbors recently requested a quote
Recommended by37%of homeowners
Avatar for Isaiah's Handyman
Isaiah's Handyman
New to Angi
Concrete Driveways - Install

Serving Kinsey, AL and surrounding areas

Approved

In business since 2009

Free estimates

Credit card accepted

Isaiah's Handyman is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Flooring  site
Flooring  site
Flooring  site
Flooring  site
Drywall Patchwork

+2

4 neighbors recently requested a quote
Avatar for Holloway Land Restoration, LLC
Holloway Land Restoration, LLC
4.8(
13
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Kinsey, AL and surrounding areas

In business since 2022

Free estimates

"Paul was very efficient with both suggestions and performance. The driveway installed was completed in less time than expected even with several adjustments made. Every effort was made to insure that the driveway work was as needed and expected. Completely satisfied"
Holloway Pond
Holloway Pond
Holloway Pond
Holloway Pond
Before

+5

Response time10 hrs
Response rate96%
Recommended by100%of homeowners
...
Showing 1-10 of 111
Asphalt Driveways questions, answered by experts

The decision to repair or replace your driveway depends on the extent of the damage. If your driveway has a few small cracks, a simple repair will do the trick. If you see larger cracks and potholes, it may be time to consider resurfacing or replacement. Resurfacing is a great option if more than 25% of the surface is damaged, but if the damage is extensive—deep cracks or significant sinking—it’s best to replace the driveway entirely. A new driveway, with proper care, can last decades while patching or resurfacing might only hold up for a few years before needing more attention.

A driveway approach is the part of a driveway where the public road meets the private driveway. This section contains several key elements, including the driveway apron, the curb cut, and the end slope. Depending on the slope of the driveway, this area may also contain the trench drain.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Building a road on a slope requires careful planning and will normally require a drainage system underneath to prevent flooding and damage to the road over time. Your professional may lengthen your road to create switchbacks if the slope directly to your home is too steep, as there are regulations for maximum road slope. The drainage system will help prevent runoff from the higher side of the slope from damaging the asphalt or concrete. Keep in mind that building a road on a slope isn’t a good DIY project, as a lot can go wrong.

The Kinsey, AL homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.