Top-rated excavation pros.

Get matched with top excavation pros in Cloverdale, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Cloverdale, AL?

Select your specific project to find the pro for you.

Find Excavation pros in Cloverdale

VVM Earthworks
New to Angi
Building Site - Preparation and ClearingExcavation - Major Grading or ReslopingLandscape - Minor Grading or Resloping

Serving Cloverdale, AL and surrounding areas

Approved

In business since 2018

Free estimates

VVM Earthworks, proudly serves our customers with pride, integrity, and attention to the details that matter most to you. This is one of the many things that sets us apart from the rest. We leave customers happy and give them a part of us of what we are proud too do.

Avatar for 3C Land Design
3C Land Design
New to Angi
Landscape - Minor Grading or Resloping

Serving Cloverdale, AL and surrounding areas

Approved

In business since 2023

Free estimates

Offers commercial services

With years of experience, 3C Land Design is committed to excellence every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests and make their concerns the basis of our business. Call us today!

Response time3 days
Avatar for BCB Farms
BCB Farms
5.0(
7
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+1 more

Serving Cloverdale, AL and surrounding areas

In business since 2010

Free estimates

Emergency services offered

"I have never felt so comfortable working with any other company I have ever hired for any kind of work. Fantastic people, honest, great work. We will hire BCB anytime we need excavating or land maintenance work. As a previous reviewer; we met them on-site of our land to go over the plans. A couple months later Cassie called us. They sent pictures each day of the work and we live 700 miles away. Looking forward to a long relationship."
Finished
Finished
Finished
Near done
Before

+8

Response time2 days
Recommended by100%of homeowners
...
Showing 1-10 of 67
Excavating questions, answered by experts

There are several different factors that influence how long it takes to excavate. For a foundation, it could take anywhere from three days to three weeks. It can take even longer if you face weather-related delays or an inaccessible site that’s riddled with boulders and rough terrain. It may also take longer if you have clay soil, which is more difficult to dig.

The rules for trenching and excavation include setting up and following safety protocols, learning how to use tools and machines properly, and ensuring there is a safe exit for all workers. Keep heavy equipment and materials away from the edge of the hole or trench. Call the 811 dig line before starting any excavation or trenching project to ensure you don’t hit any electrical or gas lines.

No, you typically cannot use metal detectors to find your sewer line. Most sewer lines are made of non-metallic materials such as PVC, clay, or cast iron, which are not detectable by standard metal detectors. Metal detectors are designed to locate metallic objects, so they won't be effective for identifying the path of a non-metallic sewer line. To locate your sewer line accurately, it's best to use other methods.

Dumpsters work best on hard, study, and level surfaces made of asphalt, stone, or concrete. If the surface is uneven or too soft, the dumpster could get stuck or tip over when filled. Keep in mind that you must obtain a dumpster permit to keep it on a city street in many areas.

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

The Cloverdale, AL homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.