Top-rated ceramic tile pros.

Get matched with top ceramic tile pros in Buhl, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your ceramic tile service project in Buhl, AL?

Select your specific project to find the pro for you.

TRUSTED BY BUHL, AL HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon24
    Verified ceramic tile services reviews

Find Ceramic tile pros in Buhl

Wilber Flooring
5.0(
1
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Ceramic and Porcelain - Repair+1 more

Serving Buhl, AL and surrounding areas

Approved

In business since 2015

Free estimates

Offers commercial services

Wilber Floors is committed to excellence every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and responsibility in all of our jobs. We are a locally owned and operated business with more than 5 years of experience serving AL and surrounding areas. There is no job too big, or too small for our team. Call today and let us put our experience to work for you!\n

Recommended by100%of homeowners
Future Builders, LLC
New to Angi
Tile: Ceramic and Porcelain - Install

Serving Buhl, AL and surrounding areas

Approved

In business since 2020

Free estimates

Credit card accepted

Future Builders LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Response time2 days
Avatar for M.O. Holt Construction Services, LLC
M.O. Holt Construction Services, LLC
4.6(
53
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Repair

Serving Buhl, AL and surrounding areas

In business since 2015

Free estimates

Credit card accepted

"Marvin was wonderful. Not only was the work done efficiently and correctly he was a joy to have in the household. When a problem occurred the next day, he came quickly to my rescue. Then, returned later to permanently fix the problem. Marvin comes highly recommended."
before
before
Before
Before
during the remodel

+175

Response time3 days
Recommended by96%of homeowners
Avatar for SANDOVAL FLOORING LLC
SANDOVAL FLOORING LLC
5.0(
5
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Ceramic and Porcelain - Repair+1 more

Serving Buhl, AL and surrounding areas

In business since 2018

Free estimates

Credit card accepted

"Sandoval Flooring was first class in everything they did. I was satisfied with the process for receiving the estimate, scheduling the work, helping me with choices, completing the work, clean up, and inspecting the final job and insuring I was satisfied. I would definitely choose them again for this large job!"
Additional Photos
Recommended by80%of homeowners
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Ceramic and Porcelain - Repair+1 more

Serving Buhl, AL and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
...
Showing 1-10 of 71
Ceramic Tile questions, answered by experts

The rule tells you how to cut tile to install it in a corner. The 3/4/5 rule recommends that you should have 3 feet across on one straight line, four feet on the other perpendicular line, and 5 feet of length from the end of one of the lines to the other. You’re making a right triangle with the tile, and the hypotenuse (the line across from where the 3-foot lie and 4-foot line meet) should be 5 feet long.

If you’re out of spacers for your tile installation, you can use pennies. Each time you place a tile, stick the pennies around the edges (on the sides and the corners). Like working with spacers, you’ll want the same amount of space around each tile before they set.

Your floors should be completely level for tile, otherwise you risk damaging the tiles in the future. When there are even small gaps or hills in the subfloor beneath the tile, this puts more pressure on the tile when you walk around on the floor. With repeated traffic, the tiles are at risk of cracking, and you’ll have to deal with tile repairs sooner than if the floor was completely level.

The number of shower niches you need (or want) depends on the size of the shower and how many bathroom products you plan on storing. If you keep it simple with just soap and shampoo, the one shower niche will probably do the trick. But if you’re adding scrubs and soaks, you may need to think about installing two or more.

Yes, you can tile over existing tiles in a bathroom, but it is not always recommended. For this method to be successful, the original tile surface must be clean, flat, and free of damage such as cracks, unevenness, mold, or mildew. While tiling over existing tiles can save time and money, there are potential drawbacks. The new adhesive may not bond properly, and the process adds extra weight to the wall or floor. Additionally, the increased height of the surface could interfere with door clearances. For the best and most durable results, removing the old tiles before installing new ones is generally the better option.

The Buhl, AL homeowners’ guide to ceramic tile services

From average costs to expert advice, get all the answers you need to get your job done.