Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Wilson, WY

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Wilson, WY?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Wilson

Avatar for Groundworks
Groundworks
4.3(
28
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Wilson, WY and surrounding areas

Approved (Corporate)

In business since 2010

Free estimates

Warranties offered

"we had concrete pads added after home construction. One pad had a 2 inch settlement on one corner. Complicating this was a stone wall sitting atop the pad. Excellent restoration was done by Groundworks From Bozeman. After a thorough evaluation by Ben, Chelsea and Tyler were prompt, educational and successful. I Highly recommend this company for your concrete/foundation needs."
Basement
Basement
Basement
Basement
Foundation

+16

Response time2 days
50 neighbors recently requested a quote
Recommended by72%of homeowners
Concrete Mudjacking questions, answered by experts

Costs range from $500 to $1,500, depending on the size and condition of the area.

Concrete leveling can last anywhere from five to 10 years or more, and in some cases, it can be a permanent solution. The longevity depends on the method used and whether the underlying cause of the sinking is addressed. For example, mudjacking typically lasts five to 10 years, while polyjacking can last for 20 years or more. It's best to consult a professional for an accurate timeline based on your specific situation and any factors that could cause the issue to recur.

Most projects take 1-3 hours, with immediate usability after completion.

A good slump height really depends on the project, but there is a use for nearly all slump levels. For example, low slumps are best in projects that require structure, such as curbs and roads. High slumps often require additional reinforcement, but they flow more freely into hard-to-reach spaces.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

The Wilson, WY homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.