Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Victor, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Victor, ID?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Victor

Avatar for Solid Lifters
Solid Lifters
4.7(
29
)

Serving Victor, ID and surrounding areas

Approved

In business since 2016

Free estimates

Warranties offered

"I can't rate the value as that will occur over time. For the work they did -filling the voids under my concrete and the deep hole next to it and my spa, it seems to be a good solution. They also helped me move my spa back. They showed up when they said they would and accomplished the work in less than an hour. It took a minimal amount of communication to get the appointment and a guestimate (with only seeing pictures I sent.). They did raise the price 50% from that but (again) they had not seen the work needed until they arrived."
Gallery
Response time1 day
Response rate95%
2 neighbors recently requested a quote
Kirk Jenkins Concrete
New to Angi

Serving Victor, ID and surrounding areas

In business since 1977

Free estimates

Credit card accepted

We are a locally owned and operated company that values honesty and integrity, and treats your home as if it were our own. We offer a variety of services that are customization to each individual project. You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships, and guarantee your satisfaction!\n

Concrete Mudjacking questions, answered by experts

Generally speaking, push piers—or steel piers—are the best option for underpinning, as they reach down to solid bedrock to find support for your foundation rather than relying on soil, which could be subject to the same issues as the soil directly below your foundation. However, the best underpinning method for your home depends on your location, how far down the bedrock is, and the type of soil in your area. Helical piers are usually the best option for sandy soil or in areas where the bedrock is too deep to use steel piers.

Most projects take 1-3 hours, with immediate usability after completion.

A good slump height really depends on the project, but there is a use for nearly all slump levels. For example, low slumps are best in projects that require structure, such as curbs and roads. High slumps often require additional reinforcement, but they flow more freely into hard-to-reach spaces.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

The Victor, ID homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.