Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Afton, WY

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Afton, WY?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Afton

Avatar for RMA-BUILDS LLC
RMA-BUILDS LLC
New to Angi
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Afton, WY and surrounding areas

In business since 2022

A General Contracting and Construction Services Company. We specialize in commercial and residential construction throughout Wyoming. We provide a large or small crew with their own specific expertise depending on your project. With over 100 years in combined knowledge in the construction industry. RMA is all about quality control and 100% customer satisfaction from beginning to end of your project.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+36

Concrete Mudjacking questions, answered by experts

The timeframe is generally a few hours, allowing for immediate use post-hydration, ensuring minimal disruption to surrounding activities.

Yes, expanding foam (also known as polyurethane foam) can lift concrete. This approach, called polyjacking, involves injecting the foam rather than concrete slurry to fill voids and raise the concrete slab back into place. It’s often faster and requires smaller drill holes than traditional mudjacking, though it may come at a higher cost. Some contractors also prefer polyjacking over mudjacking for more damaged and delicate slabs.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Charges correlate with surface size, settlement depth, and access, often yielding significant savings over concrete replacement.

The method involves lifting settled concrete using pressurized cement slurry via drilled holes. This solves uneven surfaces and prevents further settling.

The Afton, WY homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.