Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Kemmerer, WY

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Kemmerer, WY?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Kemmerer

Avatar for RMA-BUILDS LLC
RMA-BUILDS LLC
New to Angi
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Kemmerer, WY and surrounding areas

In business since 2022

A General Contracting and Construction Services Company. We specialize in commercial and residential construction throughout Wyoming. We provide a large or small crew with their own specific expertise depending on your project. With over 100 years in combined knowledge in the construction industry. RMA is all about quality control and 100% customer satisfaction from beginning to end of your project.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+36

Concrete Mudjacking questions, answered by experts

Trenching and boring are two distinct methods for installing underground utilities. Trenching involves digging a channel using equipment like an excavator, trencher, backhoe, or shovel. While it is a simpler process, it causes significant disruption to the surface, landscaping, and surrounding ecosystems.

Boring, also known as directional boring, is a less invasive alternative that uses a drill to create a tunnel for utility lines without disturbing the surface. This method is more precise and is ideal for installations that need to go underneath buildings, roads, or bodies of water. Although boring is less disruptive, it is generally more expensive than trenching.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

The method involves lifting settled concrete using pressurized cement slurry via drilled holes. This solves uneven surfaces and prevents further settling.

Address drainage issues, avoid heavy loads, and seal cracks to prevent future settling.

Costs range from $500 to $1,500, depending on the size and condition of the area.

The Kemmerer, WY homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.