Top-rated cabinet makers.

Best cabinet makers near Williamstown, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your cabinet making project in Williamstown, WV?

Select your specific project to find the pro for you.

Top-Rated Cabinet makers in Williamstown - Updated Nov 2026

Avatar for High Point Cabinets
High Point Cabinets
4.9(
80
)
Custom Cabinets - Build

Serving Williamstown, WV and surrounding areas

In business since 2008

Free estimates

Warranties offered

"The entire process was great. Eli was so easy to work with and very helpful in our cabinet selection. The cabinets are beautifully made and we couldn’t be happier. I would highly recommend them and would use them again myself."
Kitchen
Built Ins
"Magazine House"
"Long Island"
Additional Photos

+1

Response time1 day
Recommended by98%of homeowners
Avatar for Arkansas Wood Doors
Arkansas Wood Doors
5.0(
8
)
Custom Cabinets - Build

Serving Williamstown, WV and surrounding areas

In business since 1977

Free estimates

Credit card accepted

"We love our cabinets! They look fantastic while remaining affordable. The friendly staff at AWD helped us from start to finish. They are very knowledgeable and gave us advice and tips when needed. They were receptive and patient with our ever-changing needs. Once we finalized our purchase, we received our cabinets within two weeks! The cabinets are very sturdy and the color is beautiful. The hinges and hardware are high quality. We are extremely pleased with AWD and would recommend them to any friends or family looking for good cabinets at a fair price."
Additional Photos
Additional Photos
.
Additional Photos
Additional Photos

+1

Recommended by100%of homeowners
Cabinet Making FAQs, answered by experts

The time it takes to install new cabinets depends on the scope of the project. For a kitchen installation, you can expect the process to take anywhere from 2-5 days for a standard layout up to a couple of weeks for more complex projects, depending on the number of cabinets and the installation space. For a smaller project, such as installing cabinets in a bathroom, you can expect the work to take a week or less. Your cabinet installation expert will be able to provide you with a realistic timeframe.

The 1/3 rule is a design guideline used by interior designers and cabinet installers to select appropriately sized pulls for cabinets and drawers. The rule suggests that for a balanced and cohesive look, a cabinet pull should be approximately one-third the height of the cabinet door or one-third the width of the drawer face. This guideline helps create a symmetrical appearance because the human eye tends to follow the length of the pull across the cabinet face.

While the 1/3 rule is a helpful starting point, it is not the only option. If a measurement falls between available pull sizes, it's generally best to size up. For an ultra-contemporary aesthetic, you can also opt for full-width pulls that span the entire drawer.

Kitchen cabinets can hold a whopping 500 pounds, but that is only possible if you attach them correctly. They must be anchored securely with long screws driven straight into the wall studs for solid support. Depending on your cabinets and the installer, some upper cabinets use specialized hanging systems or brackets for extra reinforcement, ensuring they stay put no matter how full they get.

Options include stock, semi-custom, and custom cabinets, each offering varying levels of personalization and cost.

It depends on whether you buy pre-made stacked cabinets or construct them from scratch. If you build added cabinets from scratch, you can expect it to take several hours or days to build each one and then another two to three days for installation. Then, after painting your new cabinets, you should allow a few weeks for the paint to dry thoroughly before installing them over your existing cabinets.

The Williamstown, WV homeowners’ guide to cabinet making services

From average costs to expert advice, get all the answers you need to get your job done.