Top-rated above ground pool installation pros.

Best above ground pool installation pros near Union, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Union, WV?

Select your specific project to find the pro for you.

Top-Rated Above ground pool installation pros in Union - Updated Nov 2026

Avatar for Main Street Solar
Main Street Solar
5.0(
6
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Union, WV and surrounding areas

In business since 2008

Free estimates

Credit card accepted

"Andrew and his company did an amazing job with our solar system install.  They met with us, explained our options, and delivered exactly the system we were looking for.  He was always prompt, courteous, and professional.  The system looks great on our home.  The install is very clean(which was one of my wife's big concerns).  The attention to detail that they paid to our project was amazing.  They went above and beyond what was required.
I can't say yet how much electricity our system will generate since it was just installed.
I will definitely call Andrew again when I am ready to expand our system further or add Solar water heating for our pool.

"
Professional service
Clean Installations!
Built for a life time!
Recommended by100%of homeowners
Gordon's Painting
0.0(
2
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Union, WV and surrounding areas

In business since 2007

Free estimates

Warranties offered

At Gordon's Painting we pride ourselves on exceeding customers' and clients' expectations. We take the time to really listen and understand your desires; we make sure you are fully satisfied with the job. Call us today; you'll be pleased you did. Thank you.

Recommended by100%of homeowners
Install Above Ground Pools FAQs, answered by experts

The lifespan of a semi-aboveground pool depends on the lining, but they last between seven and 15 years on average. This is right in line with what you can expect from a standard aboveground pool. In comparison, an in-ground pool can last up to 75 years with a well-maintained concrete liner.

The generator in your saltwater pool conversion kit transforms sodium chloride—the same salt as table salt—into chlorine. A process called electrolysis sends electricity through the water to interact with the chlorine ion. This ultimately creates the chlorine that keeps your pool safe and clean. The cell in your saltwater chlorine generator is the part that converts the salt into chlorine.

Pool concrete or gunite can take several weeks to cure, or an average of 30 days, before workers can resume construction. Additional work and finishes push the time to build a pool out of concrete to between three and six months. There are many types of pools that take far less time, so keep these in mind if you're on a short timeline.

Off-season pool-building prices often align with the time of year you're least likely to use a pool. Many contractors offer deals in the late fall and winter to bolster the slow time of year. However, if you live in an area with freezing winters, you'll need to wait beyond the final frost and threats of extreme weather.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Union, WV homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.