Top-rated deck maintenance specialists.

Get matched with top deck maintenance specialists in Pleasant Valley, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your deck maintenance project in Pleasant Valley, WV?

Select your specific project to find the pro for you.

Find Deck maintenance specialists in Pleasant Valley

Avatar for Highland Contracting
Highland Contracting
4.5(
22
)
Deck, Fence, Patio or Porch - Clean and SealDeck, Fence, Patio or Porch - Clean and Seal - For Business

Serving Pleasant Valley, WV and surrounding areas

In business since 2020

Free estimates

Small jobs welcome

"When I talked to them I told him that I wanted the house and the deck and patio and the fence around the deck and patio power washed. They did not do the deck nor the patio for he said it was not included in the price! They came without a ladder to power wash a two-story house and had to be provided with one!"
Response time2 days
Response rate100%
Recommended by100%of homeowners
...
Showing 1-10 of 62
Deck Maintenance questions, answered by experts

Building a deck without a permit could lead to fines for both the homeowner and the contractor. The exact penalties will depend on your state and municipal building laws. You might also be required to remove the deck and apply for a permit before you can build another. While it might be tempting to skip the permit to save a few bucks, it’ll cost you much more if you’re caught.

Two coats of stain are ideal for the best protection and aesthetic appeal. However, if your decking is made of particularly dense hardwood, you may only need one coat. If you want an intense color, two coats are ideal.

Coping is the material that lines the perimeter of a pool and seals the transition between the top of the pool wall and the water. Decking surrounds the poolscape and extends far beyond the water's edge to provide a safe walking and lounging area. In short, coping is the border between the decking and the pool itself.

It’s best to prime composite decking before painting. This promotes better paint adhesion, helps create a smooth finish, and can mean the paint job will last longer. Always follow the manufacturer’s instructions for application, allow ample primer drying time before painting (typically 24 to 48 hours), and thoroughly clean the deck boards to promote the best adhesion.

In general, you need a footing at each corner of your deck, and within 8 feet of each other. So, how many you need depends on the size and shape of your deck, plus any local building codes. It also depends on factors like the load capacity of your soil and the weight of your deck. You can find a footing calculator online or contact a pro for support.

The Pleasant Valley, WV homeowners’ guide to deck maintenance services

From average costs to expert advice, get all the answers you need to get your job done.