Top-rated subcontractors.

Best subcontractors near Montgomery, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Montgomery, WV?

Select your specific project to find the pro for you.

Top-Rated Subcontractors in Montgomery - Updated Nov 2026

Historic Restorations LLC
4.4(
16
)
Major Home Repairs (General Contractor)

Serving Montgomery, WV and surrounding areas

In business since 2003

Credit card accepted

"We hired Ed to replace a damaged section of drywall ceiling in one of the bedrooms in our house.  He came out quickly to give an estimate, started and finished the work when he said he would, and was very pleasant to deal with.  We were very happy with the results, and he stayed at the low end of his original estimate.  He even painted the finished job, which hadn't been part of our arrangement -- it was a big help to us.  We'll definitely hire him again.
"
Recommended by100%of homeowners
Avatar for United NS
United NS
5.0(
6
)
Major Home Repairs (General Contractor)

Serving Montgomery, WV and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"Good crew high quality work friendly politely easy going easy to get along with would recommend them to anyone if you want quality with fantastic pricing definitely don't hesitate to contact them"
edging and cut / trim
cut and trimming with strips
business cut and trim with stipes
Response time2 days
Recommended by100%of homeowners
Avatar for Alternative Building Concepts Inc
Alternative Building Concepts Inc
4.3(
9
)
Major Home Repairs (General Contractor)

Serving Montgomery, WV and surrounding areas

In business since 1972

"These guys were very good.  They did foundation work within a crawl space.  It was close, dirty, exhausting work.  They came when they said they would, completed the job in good time and cleaned up afterward.  If I needed work like this done again (Heaven forbid!) on another house, these are the guys I would hire.
"
Repair w/piers
Room Addition/Remodel Before
Room Addition/Remodel After
Before
After

+22

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Montgomery, WV and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 29
Subcontractors FAQs, answered by experts

Make sure you’re getting the right size to meet your space needs, including enough space both side to side and vertically to accommodate your RV’s features and allow you to safely move it in and out of the garage. 

If you’re building an attached and enclosed garage for your RV, you’ll also want to give some thought to whether you’d like to add workspace, water or electricity, or additional storage. If so, you’ll need a garage with larger dimensions.

While possible for small projects, professional designers ensure compliance with building codes and structural integrity.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

Buying a house is easier than building one from scratch. Buying an existing home is almost always faster, even if you need to make renovations once you move in. When you hire the right team to build a home, they will simplify the design and build phases so that there is little guesswork throughout the process, but building new construction will almost always take longer than buying an existing home.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

The Montgomery, WV homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.