Top-rated patio pros.

Get matched with top patio pros in Gassaway, WV

Enter your ZIP and get matched with up to 5 pros

Find Patio pros in Gassaway





D&H Construction

3.00(
2
)

D&H Construction

3.00(
2
)
Customers say: Quick response
21 years of experience

We are a small business that cover WV,VA,NC, KY, and TN doing any kind of construction from building you a house to repairing a crack. We can winterize your summer home or get it ready for you to in joy for the summer.

We are a small business that cover WV,VA,NC, KY, and TN doing any kind of construction from building you a house to repairing a crack. We can winterize your summer home or get it ready for you to in joy for the summer.


Patios questions, answered by experts

If you used regular jointing sand, you can typically walk on the repaired area right away. If you used polymeric sand, wait at least 24 hours before walking on it and 48 to 72 hours before driving over it, depending on the weather. Polymeric sand needs time to fully cure and lock the pavers in place.

Building a concrete driveway normally takes between one and three days, including the time to cure the concrete. Wait at least seven days before driving on your driveway and two days before walking on it. Your contractor may require additional time if you need to level the ground, install a drainage system, or order special concrete materials. Installing a driveway also often requires a permit, so be sure to include this wait into your prep time as well.

Cement companies often charge a per-cubic-yard cost for concrete, which averages around $130. In most cases, you can also expect to pay for leveling, surfacing, and add-on services, like stamping concrete. Here are some typical prices for common concrete projects for which you may hire a cement company.

  • Walkway: $1,800

  • Driveway: $2,800

  • Standard patio: $3,300

  • Stamped concrete patio: $4,000

  • Concrete steps: $3,500

  • Colored concrete: $3,800

You might also need to budget for removing your old concrete or additional land prep before your professional can pour concrete.

The average patio takes anywhere from 30 to 50 hours to build, including leveling the ground and paving the patio. If you’re doing the work yourself, you might want to plan on spending significantly more time, especially if you don’t have all the equipment or experience. After completing your patio build, consider hiring a pro to prepare the patio for spring.

On average, expect to pay $2,400 to $6,400 for a 20-by-20-foot concrete patio. That price includes concrete materials, labor rates, sealing, and permits. With more complex designs and premium materials and finishes, the cost may be higher. Get quotes from multiple local patio contractors to get a precise estimate for your area.

The Gassaway, WV homeowners’ guide to patio services

From average costs to expert advice, get all the answers you need to get your job done.