Top-rated subcontractors.

Get matched with top subcontractors in Bluefield, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Bluefield, WV?

Select your specific project to find the pro for you.

TRUSTED BY BLUEFIELD, WV HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon92
    Verified subcontracting services reviews

Find Subcontractors in Bluefield

Avatar for RDP Electrical Services Plus, LLC
RDP Electrical Services Plus, LLC
5.0(
21
)
Major Home Repairs (General Contractor)

Serving Bluefield, WV and surrounding areas

In business since 2009

Emergency services offered

Credit card accepted

"He came to the home to give an estimate. Was not pushy or insistent. Very thorough and honest. We decided to go with them. They were here on time and were extremely professional. Unit looks great and they even made the conduit /pipe match the house (white with the blocks and brick colored when it ran along the brick. Definitely recommend. Will contact them when it is time to replace the A/C."
Recommended by100%of homeowners
Avatar for Machen Home Improvements
Machen Home Improvements
4.0(
77
)
Major Home Repairs (General Contractor)

Serving Bluefield, WV and surrounding areas

In business since 1992

Free estimates

Emergency services offered

"I first met Jodie while he was building a large room addition, residing, and re-roofing my brother's house. I was impressed with his knowledge and workmanship. He always strived to keep the customer happy and do the job right, whatever it took. I later hired Jodie to install two different types of laminate flooring in 5 rooms of my house. I couldn't believe it, but he was in and out in 3 days. Everything was perfect."
.
.
.
.
.

+117

Recommended by90%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Bluefield, WV and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Marks Customs
Marks Customs
5.0(
3
)
Major Home Repairs (General Contractor)

Serving Bluefield, WV and surrounding areas

In business since 2018

Free estimates

"He did amazing work listened to everything I wanted and made it happen I couldn’t be anymore happier with the outcome it looks great was very clean with the demo and remodel and the wife loves it"
Bathtub
Tile
Shower
Tile
Shower

+9

Recommended by100%of homeowners
Showing 1-10 of 25
Subcontractors questions, answered by experts

Yes, such as using eco-friendly materials and energy-efficient designs for long-term savings.

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

Universal design costs can be minimal when you add them during construction; however, adding universal design principles to existing homes can sometimes increase renovation costs. For example, a mid-grade bathroom remodel is estimated to cost around $30,000, while a standard universal design remodel can cost closer to $40,000. Adding accessible design components can include widening hallways ($500 to $2,000), curbless showers ($2,000 to $8,000), and widening doors ($400 to $800). Keep in mind that these increased costs can lead to higher resale values because universal homes may appeal to a wider variety of buyers.

While you will always work with a team of professionals at some point during your home build, homeowners with experience can take on some part of the process. Manage the initial brainstorm, brief writeup, and floor layout phase with minimal assistance before contacting a general contractor. And while you can purchase stock blueprints for some home designs, it's always best to speak with professionals when choosing one ideal for your property.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

The Bluefield, WV homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.