Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Tomah, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Tomah, WI?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Tomah

Avatar for MAZE PAINTS LLC
MAZE PAINTS LLC
4.3(
6
)
Concrete Floor Coating-Apply

Serving Tomah, WI and surrounding areas

Small jobs welcome

Offers commercial services

MAZE PAINTS LLC delivers professional, reliable painting services for commercial and residential projects across Wisconsin. Customers choose us for clean prep, quality materials, and finishes that last. Every project is handled with clear communication, efficient scheduling, and attention to detail from start to finish. We focus on doing the job right the first time so your space looks sharp, clean, and professionally finished.

Florence Deck
Florence Deck
Florence Deck
Florence Deck
Florence Deck

+7

Avatar for Ultimate Concrete Coatings LLC
Ultimate Concrete Coatings LLC
New to Angi
Concrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Tomah, WI and surrounding areas

In business since 2025

Free estimates

Credit card accepted

We pride our company on reliability, great communication, integrity, and quality work. We are experts in our trade and will do our best to keep you as educated as we can on your particular task or project. We look forward to earning your business!

Floor Coatings
Floor Coatings
Floor Coatings
Floor Coatings
Floor Coatings

+6

1 neighbors recently requested a quote
Showing 1-10 of 18
Epoxy Flooring questions, answered by experts

Acid-based concrete stain is generally considered the best option because it lasts about four times as long and penetrates the deepest into concrete to give richer, full-bodied colors. If you prefer more vibrant colors, though, many water-based concrete stains are available that could provide a solution you can't find from earth-toned acid-based solutions.

Sealing the concrete before tiling is recommended to help it stand up against any water that may seep through the tiles or grout. After thoroughly cleaning the concrete with TSP, priming with a concrete primer will seal the concrete. Check the label on the primer to make sure it is also a sealant and follow the manufacturer’s instructions for application.

Most coatings take 1-3 days, including surface preparation and drying time.

You can seal a concrete slab by cleaning the surface, filling in any cracks, etching the surface, applying a sealer, and letting it dry. Concrete slabs don't typically need sealing, but you can use a topical concrete sealer if you notice signs of water damage. If you haven't already fixed the cause of the leak, then you'll want to repair the plumbing before you seal a concrete slab.

Factors like the time of day you choose to seal the concrete, temperature, humidity, and airflow will impact drying time. To shorten the drying time, seal concrete in the late afternoon on a day with a temperature between 45 to 85 degrees Fahrenheit.

The Tomah, WI homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.