Top-rated bathtub replacement pros.

Get matched with top bathtub replacement pros in Ogema, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your bathtub replacement project in Ogema, WI?

Select your specific project to find the pro for you.

Find Bathtub replacement pros in Ogema

Avatar for Tundraland Home Improvements
Tundraland Home Improvements
3.4(
126
)
Bathroom - RemodelBathtub Install or Replace

Serving Ogema, WI and surrounding areas

Approved (Corporate)

In business since 2009

Free estimates

Warranties offered

"Very satisfied with our walk in shower that replaced a bath tub. Prompt service, friendly, knowledgeable and made sure to leave everything clean when finished."
Tub to Shower Conversion
Shower Installation
Tub to Shower Conversion
Baths for the Brave
Baths for the Brave

+64

Response time1 day
206 neighbors recently requested a quote
Recommended by84%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Bathroom - RemodelBathroom - Remodel - For BusinessBathtub Install or Replace+1 more

Serving Ogema, WI and surrounding areas

In business since 2006

Credit card accepted

"They did a good job. She had to submit like a photo but my daughter had them work on the central are of the loft. The deal was for one room. She got a lot of good ideal from her and it was worth it for her. They were professional and I did not hear anything negative."
Recommended by55%of homeowners
Hip & Ridge Construction
4.5(
6
)
Bathroom - RemodelBathroom - Remodel - For BusinessBathtub Install or Replace+2 more

Serving Ogema, WI and surrounding areas

In business since 2011

Free estimates

Credit card accepted

"The roofers were extremely professional and nice. They found that the previous roofers did not put flashing around the skylights. All of the wood around them was rotten. They had to take all six skylights out to replace the wood. They did it with minimal dust inside. They took the time to put extra ice and snow barriers around the skylights. They went above and beyond. I would recommend Brian and his crew to anyone. Todd from Hip and Ridge Construction is friendly, professional and honest."
Recommended by100%of homeowners
Avatar for Matthew Moss Painting
Matthew Moss Painting
3.7(
3
)
Bathroom - RemodelBathroom - Remodel - For BusinessBathtub Install or Replace+1 more

Serving Ogema, WI and surrounding areas

In business since 1990

Emergency services offered

Credit card accepted

Interior painting, exterior painting, Log Cabin Staining sheetrock repair, carpentry work, staining, concrete painting, handyman work, pressure washing, corn cobb and walnut shell blasting, cedar roof cleaning and stain & wood floor re-finishing. Additional phone number - (218) 851-4078

Additional Photos
Additional Photos
Before
After
Before

+24

Recommended by66%of homeowners
Showing 1-10 of 24
Bathtub Replacement questions, answered by experts

Persistent leaks, outdated styles, or surface damage are indicators for a replacement.

The water supply lines run underneath the bathtub. These two pipes deliver cold and hot water to the bathtub—the cold water comes from the main water supply, and the hot water comes from the water heater. The pipes are made from copper, cream-colored plastic CPVC, or red and blue PEX tubing.

Installing a bathtub can be complex, depending on your prior plumbing experience, the type of bathtub you’re installing, and whether you need to make any changes to your bathroom’s plumbing. It’s advisable to leave this job to the pros, especially if you’re new to the world of plumbing.

The diverter valve in your bathtub is responsible for diverting water between your tub spout and your shower head. If water comes out of both at the same time, you have a faulty diverter valve. You can have a plumber replace this for you, or you can replace it yourself if you have some experience working with plumbing fixtures.

A professional bathtub installation or replacement typically takes one to three days, depending on the project's complexity and any necessary alterations. If you hire a professional, most replacements can be completed in one to three days. However, if you choose the DIY route, the process could take up to a month, as it involves removing the old tub and drywall, installing the new tub, repairing the drywall, and installing new tiling.

The Ogema, WI homeowners’ guide to bathtub replacements

From average costs to expert advice, get all the answers you need to get your job done.