Top-rated concrete leveling pros.

Get matched with top concrete leveling pros in Marshfield, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete leveling project in Marshfield, WI?

Select your specific project to find the pro for you.

Find Concrete leveling pros in Marshfield

Avatar for Sure-Dry, LLC
Sure-Dry, LLC
3.8(
19
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Marshfield, WI and surrounding areas

Approved

In business since 1994

Free estimates

Warranties offered

"I had to come out and look at my driveway. Ended up having him look at a water issue in my basement and they made a good recommendation and I’m gonna have them fix my basement into the driveway."
Sump Pump Installation
Waterproofing Basement Walls
Egress Window
Egress Window
Concrete Resurfacing

+18

Response time5 hrs
78 neighbors recently requested a quote
Recommended by54%of homeowners
Z D Anderson Concrete
New to Angi
Concrete - Injection Leveling - Mudjacking - For Business

Serving Marshfield, WI and surrounding areas

In business since 2022

Free estimates

Credit card accepted

We pride our company on reliability, great communication, integrity, and quality work. We are experts in our trade and will do our best to keep you as educated as we can on your particular task or project. We look forward to earning your business! Book with us online or feel free to give us a call today!

Concrete Leveling questions, answered by experts

A slurry of cement, sand, and water is injected beneath the concrete to lift and stabilize it.

The polyurethane used for polyjacking will expand and cure in 15 to 30 minutes. After that point, your slab will be safe to walk on and even drive on in the case of a sidewalk or concrete driveway. Double-check with your concrete lifting specialist to confirm a curing timeline, as products can differ.

Costs range from $500 to $1,500, depending on the size and condition of the area.

The timeframe is generally a few hours, allowing for immediate use post-hydration, ensuring minimal disruption to surrounding activities.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

The Marshfield, WI homeowners’ guide to concrete leveling services

From average costs to expert advice, get all the answers you need to get your job done.