Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Howards Grove, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Howards Grove, WI?

Select your specific project to find the pro for you.

TRUSTED BY HOWARDS GROVE, WI HOMEOWNERS

  • Average homeowner rating star icon4.1
    Average homeowner rating
  • Verified reviews icon16
    Verified concrete mudjacking services reviews

Find Concrete mudjacking pros in Howards Grove

Avatar for R&M Concrete Lifting
R&M Concrete Lifting
5.0(
4
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Howards Grove, WI and surrounding areas

In business since 2024

Free estimates

Small jobs welcome

"R&M Concrete did a great job getting my driveway leveled out and filling in all the cracks. They even made sure my front walkway was raised to meet code. They came the same day I contacted them to give me a quote and had it all done that same weekend. Highly recommend!!"
Driveway
Garage floor
Driveway
Driveway
Driveway

+1

Response time2 days
Recommended by100%of homeowners
Avatar for Raiserite Foundation Pier System, Inc.
Raiserite Foundation Pier System, Inc.
4.0(
12
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Howards Grove, WI and surrounding areas

In business since 1974

Free estimates

Warranties offered

"They work was done exactly when they said they would do it, at the exact price they quoted.The results were very good. I would be willing to use their service again if sections of concrete needs to be leveled. I feel comfortable recommending them to friends and relatives."
Egress Window
Egress Window Install
Interior waterproofing
Waterproofing
Polyurethane Foam Concrete Raising

+4

Response time2 days
Recommended by81%of homeowners
Concrete Mudjacking questions, answered by experts

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Many contractors offer warranties for their work. Confirm terms before starting the project.

Most houses are expected to settle over time, but foundation sinking of more than a few inches or uneven sinking of more than an inch for every 20 feet is cause for concern. Any significant or uneven sinking should be assessed by a professional to determine the cause and perform any necessary repairs. 

Mudjacking is your best bet for leveling concrete on a tighter budget. It’s less expensive than foam or grout mixture. For smaller, surface-level issues, you could also use a self-leveling compound, which creates an even surface over existing concrete—it’s a budget-friendly option suitable for DIY enthusiasts.

A good slump height really depends on the project, but there is a use for nearly all slump levels. For example, low slumps are best in projects that require structure, such as curbs and roads. High slumps often require additional reinforcement, but they flow more freely into hard-to-reach spaces.

The Howards Grove, WI homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.