Top-rated subcontractors.

Get matched with top subcontractors in Eastman, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Eastman, WI?

Select your specific project to find the pro for you.

TRUSTED BY EASTMAN, WI HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon23
    Verified subcontracting services reviews

Find Subcontractors in Eastman

Avatar for GF Company
GF Company
4.6(
152
)
Major Home Repairs (General Contractor)

Serving Eastman, WI and surrounding areas

In business since 1974

Free estimates

Credit card accepted

"we had a large double window two windows one opening replaced they did a a good job made that room much warmer in winter which is what we were after it is now the warmest room in the house in the winter which is good as it is the room we spend most our time in. will defiantly be having them out to price gutters when we are ready in the spring."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by93%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Eastman, WI and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Eastman, WI and surrounding areas

In business since 2006

Credit card accepted

"The man I talked to was very professional and timely. However, he explained that this particular job was beyond the scope of what their company does. I would certainly use them on another 'issue'.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Right Choice Construction LLC
Right Choice Construction LLC
3.8(
29
)
Major Home Repairs (General Contractor)

Serving Eastman, WI and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"The whole process went smoothly. Product was available within estimate dates. Scheduling occurred per our needs. The removal of exiting tub/shower and installation of new shower was completed in one day. Shower looks great. Everyone involved was extremely friendly. Installation team installed all accessories after consulting with us on locations. Great Job all around. We are now engaged with the company to replace our upper floor windows later this year."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+1

Recommended by90%of homeowners
Hip & Ridge Construction
4.5(
6
)
Major Home Repairs (General Contractor)

Serving Eastman, WI and surrounding areas

In business since 2011

Free estimates

Credit card accepted

"When they were here they worked all day. However there were many days when they had to go to other jobs and that caused delays on our project. Project took much longer than we thought it would. Had a hard time communicating, many times only got voice mail.Seemed to us the contractor had too many jobs going on at the same time. We did not feel our project was a high priority. Overall we are happy with the results but were quite frustrated at times"
Recommended by100%of homeowners
Showing 1-10 of 17
Subcontractors questions, answered by experts

Professionals optimize layouts, improve energy efficiency, and ensure structural safety and compliance.

Dark academia is more of an interior decorating style than it is a type of architecture, but it calls on themes prevalent in gothic architecture. Part of the appeal of dark academia is that you can achieve the look and feel without renovating or remodeling your home. Instead, you can switch to a dark color palette and introduce metal, natural wood furniture, plaid decor, old books, and gothic decor to get the look and feel just right.

Most towns and cities have regulations regarding sign dimensions for businesses. If you're opening a new business, contact the town or city's local zoning board to see the specifications you need to follow when getting your sign created. There may also be rules regarding how high your sign can sit. Be sure to learn about specifications before having your sign made. Sign companies generally won't offer refunds once custom signs have been fabricated.

The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.

When planning a general remodeling project, it's important to define the scope of work, understand your goals, and set a clear, detailed budget. You should also assess the current structure and consult with professionals like architects or contractors. Create a realistic timeline for each phase, obtain any necessary permits, and build in contingency plans for potential delays or unforeseen issues. Regular communication with all involved parties is crucial to streamline the process.

The Eastman, WI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.