Top-rated contractors.

Get matched with top contractors in Baldwin, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in Baldwin, WI?

Select your specific project to find the pro for you.

Find Contractors in Baldwin

Avatar for Wildwood Kitchens and Baths
Wildwood Kitchens and Baths
4.9(
11
)
Major Home Repairs (General Contractor)

Serving Baldwin, WI and surrounding areas

Free estimates

Credit card accepted

"Janel had many great ideas on how to best utilize our space while meeting our needs and wants for our kitchen. They were able to implement the design and do the complete remodel below our budget. We are very pleased with the results."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+58

Recommended by100%of homeowners
Avatar for The Vision Services
The Vision Services
5.0(
11
)
Major Home Repairs (General Contractor)

Serving Baldwin, WI and surrounding areas

In business since 2019

Free estimates

Warranties offered

"Excellent customer service fair pricing. Excellent work, completed on time, Amazing. Group of guys to have to do remodeling in your house Definitely will hire again"
The crew plus ! Don’t worry the little one is our son ! Learning the trade young !
Kitchen job
Smaller trim out and paint project
Altoona Roof
A finished clean will bring a nice shine to the project !!

+20

Response time9 hrs
Response rate100%
Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Baldwin, WI and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Baldwin, WI and surrounding areas

In business since 2006

Credit card accepted

"They did a good job. She had to submit like a photo but my daughter had them work on the central are of the loft. The deal was for one room. She got a lot of good ideal from her and it was worth it for her. They were professional and I did not hear anything negative."
Recommended by55%of homeowners
Showing 1-10 of 30
Unfinished Carpentry questions, answered by experts

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Proper Murphy bed installation minimizes the risk of wall damage. A secure attachment requires making some holes for anchors or brackets, but these can be easily patched if the bed is removed. To ensure the installation is done correctly and safely, hiring a professional is recommended, especially if you have limited DIY experience.

Building a barndominium means converting a barn into a house. Barndominiums are becoming popular as spacious and stylish alternatives to typical housing structures. Old barns that become houses traditionally consist of wooden construction. However, newer structures, such as pole barns, often contain metal exteriors and roofs. Converting a metal outbuilding into a house presents an excellent opportunity to create a barndominium from metal.

When deciding if you should use 2x6 or 2x8 deck joists, consider the size of the deck, joist spacing, and materials. Larger decks, larger-spaced joists, and weaker wood all require more support, meaning they need larger joists. For example, 2x8 redwood joists spaced 16 inches apart can only safely span up to 10 feet and 7 inches. On the other hand, 2x10 southern pine joists spaced 12 inches apart can be as big as 16 feet and 2 inches. If you aren’t sure what size joist is best for your project, speak with your deck builder.

Duration varies by project size, but average-sized homes typically take a weeks.

The Baldwin, WI homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.