Top-rated rototilling pros.

Get matched with top rototilling pros in Ilwaco, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Ilwaco, WA?

Select your specific project to find the pro for you.

Find Rototilling pros in Ilwaco

Avatar for UBD Dirt Wrx

UBD Dirt Wrx

No reviews yet

UBD Dirt Wrx

No reviews yet
Free onsite estimate

I operate a Kubota BX23S and larger Kubota B2600 series tractor with attachments such as Backhoe, Front Loader, Grapple, Rototiller, Post Hole Digger, Pallet Forks, 3pt Wood Chipper, Brush Hog Mower and Flail Mower for high grass, Box Blade for leveling and grading, Laser Level, 14ft dump trailer with a payload capacity of 10,000 lbs. Thurston/Lewis Counties, with a minimum of 4 hours. Outside Thurston/Lewis additional charges will be adjusted for distance and time required to reach work site. I charge by equipment and operator hours. Unloading and reloading of equip is not charged. I cater to the DIY and Homesteaders. Make a list of things you need done in an afternoon, morning, all day. I can tackle those items in 4 hour time increments or more. 7 days a week - Weather permitting. Disabled Veteran Owned and Operated

I operate a Kubota BX23S and larger Kubota B2600 series tractor with attachments such as Backhoe, Front Loader, Grapple, Rototiller, Post Hole Digger, Pallet Forks, 3pt Wood Chipper, Brush Hog Mower and Flail Mower for high grass, Box Blade for leveling and grading, Laser Level, 14ft dump trailer with a payload capacity of 10,000 lbs. Thurston/Lewis Counties, with a minimum of 4 hours. Outside Thurston/Lewis additional charges will be adjusted for distance and time required to reach work site. I charge by equipment and operator hours. Unloading and reloading of equip is not charged. I cater to the DIY and Homesteaders. Make a list of things you need done in an afternoon, morning, all day. I can tackle those items in 4 hour time increments or more. 7 days a week - Weather permitting. Disabled Veteran Owned and Operated


Additional email - [email protected]. 6 employees. Multiple payment methods accepted. Bartering okay. 67 point vertebrate pest inspection.

Rototilling questions, answered by experts

It depends on the model of your pool. You’ll always have to level the topsoil, but most vinyl-lined pools require an additional 1- to 2-inch layer of sand to protect the liner. This way, when a foot kicks down to the bottom of your pool, it’s not scraping the liner against the hard ground. If your pool isn’t vinyl-lined, you can skip this step or add a layer of another base material, like decomposed granite. Always check your manufacturer’s instructions before you begin.

When leveling the ground for a pool. If the ground is mostly level, you may be able to simply lay down pavers or pool pads to support the pool. However, you’ll still need to level the ground with sand as a base before adding other materials on top, like crushed gravel.

If you notice small bumps on your lawn, you can flatten them by gently treading them down when the ground is wet. A lawn with larger lumps may need to be regraded by a professional to flatten it out and improve the overall drainage of the yard to prevent future lumps from forming.

Professionals who complete perc tests can usually do them in a single day. Including excavating to expose the test site, filling the hole with water, and monitoring it while it drains, you can expect the test to take between four and eight hours total. It’s possible that you’ll get the results the same day, but some companies may take a few days to get official results.

People level their yards for practical and cosmetic purposes. If you have a very steep slope in your backyard, you might have a hard time with lawn maintenance. Or, if you want to entertain in the summer but don’t have a flat yard, building a patio would be quite difficult.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.