Top-rated rototilling pros.

Get matched with top rototilling pros in Pe Ell, WA

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Pe Ell, WA?

Select your specific project to find the pro for you.

Find Rototilling pros in Pe Ell

Avatar for UBD Dirt Wrx

UBD Dirt Wrx

186 Hart Road
No reviews yet

UBD Dirt Wrx

186 Hart Road
No reviews yet
Free onsite estimate

I operate a Kubota BX23S and larger Kubota B2600 series tractor with attachments such as Backhoe, Front Loader, Grapple, Rototiller, Post Hole Digger, Pallet Forks, 3pt Wood Chipper, Brush Hog Mower and Flail Mower for high grass, Box Blade for leveling and grading, Laser Level, 14ft dump trailer with a payload capacity of 10,000 lbs. Thurston/Lewis Counties, with a minimum of 4 hours. Outside Thurston/Lewis additional charges will be adjusted for distance and time required to reach work site. I charge by equipment and operator hours. Unloading and reloading of equip is not charged. I cater to the DIY and Homesteaders. Make a list of things you need done in an afternoon, morning, all day. I can tackle those items in 4 hour time increments or more. 7 days a week - Weather permitting. Disabled Veteran Owned and Operated

I operate a Kubota BX23S and larger Kubota B2600 series tractor with attachments such as Backhoe, Front Loader, Grapple, Rototiller, Post Hole Digger, Pallet Forks, 3pt Wood Chipper, Brush Hog Mower and Flail Mower for high grass, Box Blade for leveling and grading, Laser Level, 14ft dump trailer with a payload capacity of 10,000 lbs. Thurston/Lewis Counties, with a minimum of 4 hours. Outside Thurston/Lewis additional charges will be adjusted for distance and time required to reach work site. I charge by equipment and operator hours. Unloading and reloading of equip is not charged. I cater to the DIY and Homesteaders. Make a list of things you need done in an afternoon, morning, all day. I can tackle those items in 4 hour time increments or more. 7 days a week - Weather permitting. Disabled Veteran Owned and Operated




Additional email - [email protected]. 6 employees. Multiple payment methods accepted. Bartering okay. 67 point vertebrate pest inspection.

Rototilling questions, answered by experts

Pros will assess your soil type, property geography, and rain patterns for optimal slope.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

Professionals who complete perc tests can usually do them in a single day. Including excavating to expose the test site, filling the hole with water, and monitoring it while it drains, you can expect the test to take between four and eight hours total. It’s possible that you’ll get the results the same day, but some companies may take a few days to get official results.

Yes, rain can affect the results of a perc test because it will partially saturate the soil and slow down the rate of drainage. Ideally, you should do a perc test during the driest time of the year and try to schedule it after a stretch of days where no precipitation occurs. This will give you the best chance of passing.

Hardscaping often requires preparation of the ground in the area where the feature is being installed. This can include digging, compacting, and leveling the soil, ensuring adequate drainage, and removing any existing plants. The extent of preparation needed will depend on the type and size of the hardscaping feature being installed.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"