Top-rated wallpaper pros.

Get matched with top wallpaper pros in Belfair, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your wallpaper service project in Belfair, WA?

Select your specific project to find the pro for you.

Find Wallpaper pros in Belfair

Avatar for Honeycomb Construction
Honeycomb Construction
4.8(
40
)
Wallcovering or Wallpaper - InstallWallcovering or Wallpaper - Removal

Serving Belfair, WA and surrounding areas

In business since 2019

Free estimates

"Excellent job!!! Honeycomb construction LLC did for us painting exterior they done superb everything what they promise it was complete! fast ,clean ,professional. we have more plan on project definitely we will go with honeycomb construction, Eugene and his team excellent company!!"
exterior
exterior
exterior
exterior
exterior

+32

Response time1 day
Response rate86%
Recommended by97%of homeowners
Palm Construction and Remodeling Inc.
4.2(
88
)
Wallcovering or Wallpaper - InstallWallcovering or Wallpaper - RemovalWallcovering or Wallpaper - Repair

Serving Belfair, WA and surrounding areas

In business since 2020

Free estimates

Offers commercial services

"I am very pleased with the work that was done on my home. Palm construction took on two renovations projects at my house. Other companies weren’t willing to entertain the simultaneous projects. They were even able to start ahead of schedule. My bathroom fixtures were moved around to function better, give me more space, and the space was fully renovated. I am in love with the tile work that they did. In my kitchen they were able to change the layout, to give me the open concept I wanted. I was able to switch from electric to a gas range and the cabinetry that was installed is beautiful/high quality. The entire process was virtually stress free with the communications and updates I was given. All the timelines were met and exceeded. I would highly recommend Palm construction for any home project."
Response time2 days
Recommended by90%of homeowners
Ybarra Professional Builders
4.3(
80
)
Wallcovering or Wallpaper - InstallWallcovering or Wallpaper - RemovalWallcovering or Wallpaper - Repair

Serving Belfair, WA and surrounding areas

In business since 1977

Free estimates

Credit card accepted

"We recently had Ybarra Professional Builders do some remodeling in our home. We had a new tiled shower put in our master bathroom. We had new quartz countertops and appliances installed in the kitchen. We had the cabinets in the bathroom and kitchen refinished. And we had the whole house painted on the inside. Mike Haim was our project manager and we appreciated his excellent service and vision. Oswaldo and Ray were our expert workmen and they did the whole project. It was great only having two people come in and out to do the work. The company has all their own workmen and so you donâ t have someone new for each job. We canâ t say enough good things about the work that was done and the people who did it. We wouldnâ t think of calling someone else, if we want something done again. Thanks Mike, Oswaldo and Ray! It looks wonderful!"
Response time4 days
Recommended by83%of homeowners
Avatar for Elevation NW Inc
Elevation NW Inc
4.6(
10
)
Wallcovering or Wallpaper - RemovalWallcovering or Wallpaper - Repair

Serving Belfair, WA and surrounding areas

In business since 2011

Free estimates

Credit card accepted

"They did a great job. They pressure washed, caulked and painted with a set time and cost. I also had them re- side my stand alone garage, replace a barn door with an overhead door and a new entry door before painting and that was included in the bid. They are hard workers! I was able to add some interior work in the garage that they were able to do in a few days after the former job, with extra cost to me. So nice to have it all completed!"
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Front
After

+23

Recommended by88%of homeowners
Avatar for JD BERGEVIN HOMES
JD BERGEVIN HOMES
4.3(
19
)
Wallcovering or Wallpaper - RemovalWallcovering or Wallpaper - Repair

Serving Belfair, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"TLDR; Driving progress is up to you.  Painter is incompetent.  Will miss every deadline.  No green building acumen.
  I hired Joe to add a bedroom to my house and pour a concrete pad for another room.   It was a straightforward project he estimated would take 2.5 months (10/1-12/15).  He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25.  From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
  10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered.  Within a month the trusses and roof were on and the windows were installed.  So far, so good, but this was all done by one sub.
  Then things started going in slow motion.  I moved out for the month of November so they could get the dusty indoor work done without disturbing my family.  There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall.  Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates.  Although he said he could provide one, he never did.
  He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump.  I had to push out that date by 2 weeks.  Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
  For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect.  The first one, the sider didn?t show.  I wasn?t around for the 2nd one.  The third time he sent a sider who had never worked with outsulation before.  To his credit, he paid for the 3rd meeting.  Although the architectural drawings went into explicit detail, the sider required handholding to understand them.  My architect was visibly frustrated explaining the installation process to him over the language barrier.   The sider charged $8000 for 4 days of work.  It was $2900 over Joe?s original bid.   This seemed high for 2 reasons.  1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600.   2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help.  When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price.  Not buying this explanation, I called the sider myself.  I asked him if he had provided Joe with a bid before he started working and he said no.  I asked him if Joe had asked him to come down in price and he said no.  So Joe essentially wrote him a blank check with my money.
  By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained.  I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out.  I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible.  Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines.  Joe went back into slow motion.  I?ve attached a full timeline so you can get a taste of this.
  Probably the biggest debacle of the project was the exterior painting.  I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice.  Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.?  More and more rain kept coming, so they covered their sprayer to protect it while they continued painting.  Then it started a downpour.  All the paint washed off.  They returned the next day to continue.  It rained again that day.  They didn?t prime any of the bare wood and painted it while it was soaking wet.  Not surprisingly, very little of it adhered to the wood.  I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining.  But the paint job looks terrible.  There remain bubbles, drips, uneven coloration and almost bare wood in places.  (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right.  Joe has repeatedly told me he would make it right, but hasn?t delivered.  I scheduled a meeting with the painters to come out and review their work, but they never showed.  Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
  Twice during the project I was approached by his subs asking for money.  Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs.  First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy.  The door guy said, it takes a long time for Joe to pay.  It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
  Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete.  The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture).  Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"
Recommended by71%of homeowners
Showing 1-10 of 15
Wallpapering questions, answered by experts

You may end up with extra wallpaper once your project is finished. Hang on to that wallpaper, as you may need to use it to patch up areas that get damaged later on. If you have a lot of excess wallpaper, try getting creative with it. You can use it to line the inside of a cabinet or drawers, for example.

When choosing materials for finishing basement walls, consider factors such as moisture resistance, durability, and fire resistance. Opt for materials specifically designed for basement environments, like moisture-resistant drywall or cement board. Insulation with vapor barriers can help regulate temperature and prevent condensation. Consider using mold-resistant paints or coatings. 

Research and consult with experts to select materials that are suitable for your specific basement conditions and intended use. Prioritize quality and compatibility to achieve long-lasting and aesthetically pleasing results.

While peel-and-stick wallpapers require no time to cure, the adhesives for other types of papers will take a day or two to dry and up to three weeks to fully cure. The differences are the type of paper, the type of adhesive, and the humidity and temperature in the space. 

The average cost to install or hang wallpaper is around $575 per room or project, with typical prices ranging from $200 to $1,500. Costs can be higher for custom or luxury products. Since project size varies, it's often helpful to estimate labor costs per square foot, which generally fall between $1 and $7, with an average of $4 per square foot. The total cost depends on several factors, including the quality and type of wallpaper, the size and type of the room, and whether old wallpaper must be removed first. Opting for less expensive materials like peel-and-stick wallpaper or choosing to do the installation yourself can lower the overall cost. For the most accurate estimate, it is best to have a professional inspect the space and provide a quote.

Because replacing pool tiles requires fully draining your pool, it’s a great opportunity to complete other projects. You may want to replace your pool’s vinyl liner or repair cracks. You might also replace your swimming pool heater or even take on the cost of resurfacing your pool. Resurfacing, although relatively costly, can help prolong the lifespan of your pool.

The Belfair, WA homeowners’ guide to wallpaper services

From average costs to expert advice, get all the answers you need to get your job done.