Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Aberdeen, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Aberdeen, WA?

Select your specific project to find the pro for you.

TRUSTED BY ABERDEEN, WA HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon55
    Verified backsplash installation services reviews

Find Backsplash installation pros in Aberdeen

Avatar for Orca Tile and Stone
Orca Tile and Stone
5.0(
12
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - Install+1 more

Serving Aberdeen, WA and surrounding areas

In business since 2023

Free estimates

Small jobs welcome

"Was I ever lucky to hire Cliff! 35 years of experience, very detail oriented, easy to work with. He found that the first batch of tile I bought was all faulty. There was sand grit exposed in the finish glaze and the edges were wider in some spots that others which, he told me, would effect the uniformity of the grout lines. Then he went with me to get excellent tile. I would never have known that."
Water Feature
Beautiful bathroom!
Tile Art for the Wall
Fireplace - Tile and Stone
Laundry Room - Herringbone

+85

Response time5 hrs
Response rate100%
Recommended by60%of homeowners
Avatar for Scatter Creek Construction, LLC
Scatter Creek Construction, LLC
4.1(
30
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Aberdeen, WA and surrounding areas

In business since 2009

Free estimates

Emergency services offered

"The project included a purchase of a new fireplace and a remodel of the mantel and fireplace surround.  I contracted with Jake of Scatter Creek Construction earlier in the year for a roofing repair/remodel and was highly satisfied with the project. This project required three phases. First the removal of the old mantel and surround as well as the preparation for removal of the old fireplace.  The second phase was the installation of the new fireplace.  The third was remodel of the fireplace wall including a mantel, tile surround, and box insert for the multimedia center.    Scatter Creek was contracted for phase 1 and 3.  A local fireplace retailer handled phase 2.  Jake and I met to review the conceptual design and plan the work.  He explained the work breakdown structure, sequence of events, and the expected time frames to complete the different work activities.   The primary materials needed were to select the type of tile for the fireplace surround and the wood type and design for the mantel shelf.  I did most of my research on the web, went to local home improvement stores to view the tiles and mantels we had in mind, and sent pictures and web links to Jake for him to provide the bid. He estimated that the project work would take less than a week to complete. Jake was hard to get hold of and, when I questioned if he was interested in the project, he finally got back to me. Because of the delay in getting the bid finalized we missed an opportunity for the fireplace installer consequently delaying the project for 25 days.  I removed all the furnishings in the room except for the couch and love seat, which Jake offered to move.  When Jake arrived for the room prep he was not equipped to move the furniture but covered it instead.  My wife fretted over the furniture for the duration of the project. Jake was responsible for the fireplace removal prior to the fireplace installation.  When the fireplace installer arrived the fireplace hadn't been removed.  Fortunately the fireplace retailer worked with us and convinced his installer to remove the old unit for an additional price.  Jake offered an apology and covered the costs but did not provide a good reason for the mix up.  The wall construction and tiling was dirty work and although Jake cleaned up some at the end of each day there was still a considerable amount of dust throughout the house.  At one point I had to inform Jake that the dirt left on the brand new fireplace during the tile and grout work left me pretty frustrated with the process.  The job also took three weeks to complete which didn't seem unreasonable considering the work performed but definitely was disappointing for my wife who felt she was promised one week to complete. At the conclusion of the project the outcome came out just as I had visualized and what Jake had convinced me he could do in his proposal.  I thought the pricing was fair, the craftsmanship was superior, and we are enjoying our remodeled living space.   Although the outcome was a success, the process had it's flaws with miscommunications, an over promise and under delivery on completion date, and at times the poor condition of the area of the house being worked on."
Before.
After.
Additional Photos
Additional Photos
Additional Photos

+1

Recommended by84%of homeowners
Avatar for Precision Tile
Precision Tile
4.0(
4
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Aberdeen, WA and surrounding areas

Emergency services offered

"Edgar and his crew did a fantastic job of remodeling our 69 year old bathroom! Communication was great and the job was completed in the time frame he stated. The upgrade from a cast iron bathtub to a tile walk in shower is amazing! Don't hesitate, hire Precision Tile and Home Remodel to do your remodel today!!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+93

Recommended by100%of homeowners
1st Class Services
5.0(
2
)
Tile: Ceramic and Porcelain - Install

Serving Aberdeen, WA and surrounding areas

In business since 2006

Free estimates

Small jobs welcome

"I'd hire 1st Class Services again. Kevin, the owner, was very nice and provided good service. He visited our property to give us a free estimate for replacing a sliding glass door, and he was able to do the job in the same week. There were some additional costs on the project, but Kevin kept to the original bid."
Recommended by100%of homeowners
Showing 1-10 of 26
Backsplash Installation questions, answered by experts

Lack of durability is the most significant downside of painting tile. However, a painted tile backsplash doesn't see the same kind of action as, say, painted flooring tiles. For backsplashes, the durability of the finish is crucial because they often require cleaning. However, you can minimize the durability problem by using mild cleaners and water on the painted surfaces.

Flooring transition strips can be secured to the subfloor using glue, nails, or screws. For a more secure installation, especially in high-traffic areas, using screws or nails is recommended as it reduces the risk of slippage. However, if aesthetic appeal is a priority, glue provides a cleaner, more seamless finish without any visible holes or screw heads.

You should always use caulk instead of grout where the tile meets the wall. This will help your tile installation look great and last a long time. When you accidentally use grout for the corner seams, you end up making the tiles too rigid. So as the wall shifts over time, your tiles have no wiggle room. This can lead to tile damage, which will eventually require you to do at least a partial reinstallation.

If you’re handling your tile removal yourself, seal the room using painter’s tape and heavy-duty contractor bags to prevent dust and shards from escaping. Use a claw hammer or a pry bar and a mallet to get behind the tile and pry it away from the floor or wall. Once your tiles are all removed, sweep everything into contractor bags for disposal, being careful not to overfill them. Make sure you wear a dust mask, safety goggles, and work gloves to keep yourself safe from injury while you work.

The process takes two to four days, depending on the size of the area and your experience level. The first day involves assessing and prepping the existing tile, while the second day is for laying the new tile. This may take longer in complex areas. After letting the adhesive dry for 24 hours, grouting and sealing can be completed on day three. For larger projects or intricate tile patterns, expect the timeline to stretch a bit longer. Also, proper drying time between steps is essential for long-lasting results, which extends the project’s time.

The Aberdeen, WA homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.