Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Wells River, VT

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Wells River, VT?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Wells River

Avatar for Central Vermont Construction, Inc.
Central Vermont Construction, Inc.
3.3(
24
)
Asphalt Paving - InstallAsphalt Paving - Repair or PatchAsphalt Sealing+1 more

Serving Wells River, VT and surrounding areas

Approved

In business since 1991

Free estimates

Credit card accepted

"Quick reply, fast estimate, soon scheduled, and done the job. Maybe too fast: the edges of the new pavement were uneven and jagged, but, on my request, they came back and fixed them. But also, with every rain, deep puddles form a few feet in front of the garage. I regret not having explicitly specified before the job that I expect the water to run off--but should I have to."
before
after
after
after
before

+98

Response time2 days
13 neighbors recently requested a quote
Recommended by70%of homeowners
Avatar for Fortin's Construction LLC
Fortin's Construction LLC
5.0(
2
)
Concrete Driveways - Install

Serving Wells River, VT and surrounding areas

Approved

In business since 2024

Free estimates

Offers commercial services

"They were efficient, great communication through the process and exacting when following the plans, a perfect job!! I am so happy with the work! Ill hire them again and recommend them all day long!!"
ICF foundation
ICF foundation
Response time8 hrs
Response rate100%
2 neighbors recently requested a quote
Avatar for Kowboy Property Maintenance
Kowboy Property Maintenance
3.0(
4
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Wells River, VT and surrounding areas

In business since 2025

"Kane and his crew promptly removed a dangerous tree from our property that we were worried about. He was prompt and courteous and so easy to work with. I would not hesitate to recommend his firm to anyone. Again thank you Kane."
Response time8 hrs
Response rate94%
Showing 1-10 of 30
Asphalt Driveways questions, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

When comparing installation costs, asphalt is often less expensive upfront than concrete. Asphalt prices typically range from $7 to $15 per square foot, while concrete can range from $3 to $18 per square foot. However, long-term costs should also be considered. Concrete driveways generally last longer (up to twice as long) and require less maintenance, which can make them more affordable over their lifespan. While asphalt has a lower installation cost and is easier to repair, it requires more frequent maintenance, such as sealing, which can add up over time. Therefore, while concrete is more expensive initially, its durability may offset the cost in the long run.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

In the United States, roads are usually categorized as one of three types: public roads, other drivable roads, and non-drivable roads. These categories dictate how a road can be used; a non-drivable road might be classified that way because it is heavily damaged and unsafe for cars.

Depending on project size, typically 1 to 3 days, including preparation and installation.

The Wells River, VT homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.