Top-rated basement remodelers.

Best basement remodelers near Newport, VT

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Newport, VT?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Newport - Updated Nov 2026

Avatar for Fresh Start Remodeling and Repair, LLC
Fresh Start Remodeling and Repair, LLC
4.7(
14
)
Basement - Remodel

Serving Newport, VT and surrounding areas

Approved

In business since 2022

Free estimates

Credit card accepted

"James and Dustin did a great job. They were here when they said they would be, good communication, very professional! Never left a mess, and very accommodating. We would definitely recommend Fresh Start Remodeling and Repair."
1 neighbors recently requested a quote
Recommended by38%of homeowners
N. B. Construction
4.2(
9
)
Basement - Remodel

Serving Newport, VT and surrounding areas

Approved

In business since 2005

Free estimates

Customers say: Terrific value

"Nick was extremely busy but took time to come introduce himself and look at the job. He replaced some rotting boards on the house and around our woodstove pipe. He did excellent work and came when he said he would be there. I will recommend him to anyone else who is looking for a builder."
repairing rotten plywood
roof completed
smith job
smith remodel
smith remodel

+56

Response time2 days
Recommended by100%of homeowners
Avatar for Vista Home Improvement
Vista Home Improvement
4.3(
419
)
Basement - Remodel

Serving Newport, VT and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"The work did by Vista Home Improvements turned my 30+-year-old house back into a home I looked forward to showing others. The planning stage was painless and professional. Brian was incredible to work with and had a great deal of knowledge on choosing the right materials and colors that were perfect for my house. The work started soon after meeting with Brian. The work was done in a timely manner and the workers were efficient and took care of my yard. I love how my house looks now!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+41

Recommended by87%of homeowners
Avatar for AME BUILDERS
AME BUILDERS
4.8(
6
)
Basement - Remodel

Serving Newport, VT and surrounding areas

In business since 2016

Free estimates

AME BUILDERS proudly serves its customers with pride, integrity and attention to the details that mater most to you. We focus heavily on timelines with are start and completion schedule for your job. We understand and respect your time and space. We take a lot of pride in are work and make it a neat and organized job site. When we leave a job site we make sure it’s 100% picked up and a safe environment. Are goal is to satisfy you 100% with are work we do. We always hope of EARNING repeat business. We believe heavily on making the customers 100% satisfied with are work and work performance. Please give us a call today and we would be happy to meet you and go over with everything with you AME BUILDERS \nCell 603-991-4457\nHome 603-838-8250

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+22

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Newport, VT and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 27
Basement Remodel FAQs, answered by experts

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

Installing a bathroom in a basement isn’t a project for most homeowners. Many parts—plumbing, electricity, and carpentry—go into this project, each requiring expert-level knowledge and tools. One miscalculation can lead to very expensive repairs. Plus, some homeowner’s insurance might not pay for damages caused by a homeowner DIYing this project. You can protect yourself by allowing the pros to complete this job for you. 

In addition to overseeing new home builds, construction managers work on large renovations and major remodels. For example, they may work with designers and oversee the construction of a finished basement, kitchen renovation, or a home addition. They may also oversee large-scale remodels, such as the update of a historic home. Construction managers step into small projects for more specific assistance, such as building budgets and compiling the team.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Newport, VT homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.