Top-rated basement remodelers.

Get matched with top basement remodelers in Glover, VT

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Glover, VT?

Select your specific project to find the pro for you.

Find Basement remodelers in Glover

Avatar for Kennison Construction LLC
Kennison Construction LLC
4.1(
18
)
Basement - Remodel

Serving Glover, VT and surrounding areas

Approved

In business since 2022

Free estimates

Credit card accepted

"Great customer service! Emilio communicated extra problems and helped us deal with them as well as the ceiling replacement! I have more projects that they will come back and complete in the spring!"
Bathroom remodel
11 neighbors recently requested a quote
Recommended by57%of homeowners
N. B. Construction
4.2(
9
)
Basement - Remodel

Serving Glover, VT and surrounding areas

Approved

In business since 2005

Free estimates

Customers say: Terrific value

"Nick was extremely busy but took time to come introduce himself and look at the job. He replaced some rotting boards on the house and around our woodstove pipe. He did excellent work and came when he said he would be there. I will recommend him to anyone else who is looking for a builder."
repairing rotten plywood
roof completed
smith job
smith remodel
smith remodel

+56

Response time2 days
Recommended by100%of homeowners
Avatar for Stark Construction LTD. CO.
Stark Construction LTD. CO.
5.0(
1
)
Basement - Remodel

Serving Glover, VT and surrounding areas

Approved

In business since 2024

Free estimates

Warranties offered

We are a locally owned and operated construction company that values honesty and integrity in all aspects of our business. Our major focus is on the quality of our work and producing outstanding results. We are committed to creating a level of value unmatched by our competitors. We look forward to building lasting relationships with our clients and guarantee your satisfaction! we strive to

Our Work
Our Work
Our Work
Our Work
Deck Rebuild

+11

Response time1 day
8 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Vista Home Improvement
Vista Home Improvement
4.3(
419
)
Basement - Remodel

Serving Glover, VT and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"The work did by Vista Home Improvements turned my 30+-year-old house back into a home I looked forward to showing others. The planning stage was painless and professional. Brian was incredible to work with and had a great deal of knowledge on choosing the right materials and colors that were perfect for my house. The work started soon after meeting with Brian. The work was done in a timely manner and the workers were efficient and took care of my yard. I love how my house looks now!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+41

Recommended by87%of homeowners
Avatar for AME BUILDERS
AME BUILDERS
4.8(
6
)
Basement - Remodel

Serving Glover, VT and surrounding areas

In business since 2016

Free estimates

AME BUILDERS proudly serves its customers with pride, integrity and attention to the details that mater most to you. We focus heavily on timelines with are start and completion schedule for your job. We understand and respect your time and space. We take a lot of pride in are work and make it a neat and organized job site. When we leave a job site we make sure it’s 100% picked up and a safe environment. Are goal is to satisfy you 100% with are work we do. We always hope of EARNING repeat business. We believe heavily on making the customers 100% satisfied with are work and work performance. Please give us a call today and we would be happy to meet you and go over with everything with you AME BUILDERS \nCell 603-991-4457\nHome 603-838-8250

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+22

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Glover, VT and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Doug Hodge Company
Doug Hodge Company
5.0(
5
)
Basement - Remodel

Serving Glover, VT and surrounding areas

In business since 1974

Free estimates

Warranties offered

Doug Hodge Siding and Windows and Roofing Company., has been providing energy efficient home improvement services for over 35 years in Vermont's NEK--from Burke to Lyndonville, Saint Johnsbury and Newport, VT to Littleton, NH. \n\nAs a professional roofing contractor, restoration expert and carpenter, Doug has worked on hundreds of homes, replacing windows, installing vinyl siding and providing new roofing, from standing seam roofs to shingle roofs to steel roofs. \n\nCall Doug today for your free window, roofing, siding or mold remediation and fire damage restoration estimate.

Response time2 days
Response rate91%
Showing 1-10 of 38
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

It’s less expensive to finish your basement than it is to build an addition to your home. The average cost to refinish a basement is $32,000 (between $7 and $23 per square foot) while building an addition to your home costs $50,325 ($80 to $210 per square foot). Depending on the size of your basement and other factors, like moving plumbing and electrical, refinishing a basement is a more cost-effective option in most cases.

When choosing materials for finishing basement walls, consider factors such as moisture resistance, durability, and fire resistance. Opt for materials specifically designed for basement environments, like moisture-resistant drywall or cement board. Insulation with vapor barriers can help regulate temperature and prevent condensation. Consider using mold-resistant paints or coatings. 

Research and consult with experts to select materials that are suitable for your specific basement conditions and intended use. Prioritize quality and compatibility to achieve long-lasting and aesthetically pleasing results.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Some older homes have toilets in the basement to combat sewage backups. This type of toilet, also known as a Pittsburgh potty, acted as a safety valve over the incoming sewer line. If a line backed up, it would back up into the toilet because it was the lowest fixture in the home, keeping it out of sight and away from the finished areas of the house.

Basement toilets were also used by workers with messy jobs, like those who worked in coal mines or steel mills. This way, they could clean up and avoid tracking dirt through their home.

The Glover, VT homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.