Top-rated basement remodelers.

Get matched with top basement remodelers in Gladys, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Gladys, VA?

Select your specific project to find the pro for you.

Find Basement remodelers in Gladys

Avatar for Owens Corning Basement Finishing System
Owens Corning Basement Finishing System
4.6(
767
)

Serving Gladys, VA and surrounding areas

Approved

In business since 1990

Free estimates

Warranties offered

"We had a great experience with the Lux Renovations and Owens Corning team. The whole process was very easy from designing the space, selecting colors, and having a contract manager who organized the entire basement remodel including all the trades and inspections. We were sold on the Owens Corning materials for the basement and that they were engineered specifically for a basement space. Would highly recommend this team for your basement remodel needs."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+42

Response time1 day
Response rate99%
164 neighbors recently requested a quote
Avatar for Upgrade Remodeling LLC
Upgrade Remodeling LLC
4.5(
43
)

Serving Gladys, VA and surrounding areas

In business since 2023

Free estimates

Credit card accepted

"We recently had our kitchen remodeled by Upgrade Remodeling, and we couldn’t be more pleased with the entire experience. From start to finish, the process was smooth, efficient, and professional. The crews that came out were incredibly hardworking, knowledgeable, and, most importantly, respectful—both toward us and our home. What really impressed us was how organized and efficient the team was. They completed the entire kitchen remodel in just 5 days, which is remarkable considering the amount of work to be done. Every step of the way, they kept the space tidy and treated our home with care, which we truly appreciated. Our new kitchen looks fantastic, and we’re so glad we chose Upgrade Remodeling. We highly recommend them to anyone looking for a reliable, skilled, and courteous remodeling team."
Response time2 days
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Gladys, VA and surrounding areas

In business since 2006

Credit card accepted

"I sent pictures of my space, and talked with a designer on the phone. 
But it was near the holidays and due to time constraints by the designer
and by myself, we never got back together for suggestions.  After so much time had passed, and the deal had expired, I just never contacted them again."
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Copper Fox Home Solutions
Copper Fox Home Solutions
5.0(
1
)

Serving Gladys, VA and surrounding areas

In business since 2000

Free estimates

Emergency services offered

We specialize in basement finishing and more! We guarantee your satisfaction, and we won’t leave until the job is done right. We pride ourselves on the quality work we provide, while delivering great customer service! Check out all the services we offer below and call -or- click to schedule a free estimate today!

Basement pictures
Basement pictures
Basement pictures
Basement pictures
Basement pictures

+76

Avatar for N H Stone Companies LLC
N H Stone Companies LLC
5.0(
4
)

Serving Gladys, VA and surrounding areas

In business since 2010

Free estimates

Credit card accepted

"Highly recommend these guys! They are hardworking, reliable and highly skilled in all things home remodeling/repairs. Their craftsmanship in their woodwork is outstanding and they can build you beautiful additions to your home deck/porch!"
Response time3 hrs
Avatar for Jordan Home Maintenance
Jordan Home Maintenance
5.0(
2
)

Serving Gladys, VA and surrounding areas

In business since 1993

Free estimates

Emergency services offered

"Barry mows and blows our lawn about weekly.  On occasion I have asked him to plant a few things, remove some walkway bricks to the basement door area.  He is always cheerful and willing to help.  He has won the business of several of my neighbors.
"
Recommended by100%of homeowners
Showing 1-10 of 23
Basement Remodel questions, answered by experts

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

In addition to overseeing new home builds, construction managers work on large renovations and major remodels. For example, they may work with designers and oversee the construction of a finished basement, kitchen renovation, or a home addition. They may also oversee large-scale remodels, such as the update of a historic home. Construction managers step into small projects for more specific assistance, such as building budgets and compiling the team.

Home improvements that increase value offer a high return on investment (ROI) and can enhance your quality of life. Upgrades to your home’s curb appeal often add the most value, with garage door replacement having one of the best ROIs at 93%. Other high-value exterior projects include replacing your front door, upgrading siding and roofing, installing a stone veneer, adding new windows, and landscaping. For interior renovations, a fresh coat of paint provides an excellent ROI. Major projects like a kitchen remodel or upgrading appliances and HVAC systems also add significant value, as potential buyers appreciate the peace of mind that new equipment provides.

Common mistakes when finishing basement walls include neglecting proper insulation, insufficient moisture management, and poor ventilation. Not addressing these issues can lead to mold growth, water damage, and discomfort. Additionally, inadequate planning, improper framing, and rushing the project can result in subpar outcomes. 

It's essential to follow best practices, seek professional guidance if needed, and prioritize thoroughness and attention to detail.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Gladys, VA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.