Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Faber, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Faber, VA?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Faber

Avatar for Main Street Solar
Main Street Solar
5.0(
6
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Faber, VA and surrounding areas

In business since 2008

Free estimates

Credit card accepted

"Andrew and his company did an amazing job with our solar system install.  They met with us, explained our options, and delivered exactly the system we were looking for.  He was always prompt, courteous, and professional.  The system looks great on our home.  The install is very clean(which was one of my wife's big concerns).  The attention to detail that they paid to our project was amazing.  They went above and beyond what was required.
I can't say yet how much electricity our system will generate since it was just installed.
I will definitely call Andrew again when I am ready to expand our system further or add Solar water heating for our pool.

"
Professional service
Clean Installations!
Built for a life time!
Recommended by100%of homeowners
Avatar for James Pools Repair & Services LLC
James Pools Repair & Services LLC
5.0(
3
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Faber, VA and surrounding areas

In business since 2015

Free estimates

Emergency services offered

Intex Commercial Pools, Pool Repairs ,Closing ,Opening ,installs ,Clean\nSpa Repair , Cleaning ,Closing, hot tub repair\n\nI try my best to make every customer happy I care about satisfication and saving money I have kids I take care of that look up to me so I grind my butt off for them everyday to show them that hard work plays off Im all about helping families make memories and putting a smile on kids faces\n\nI been in business for 2 years now I been doing this for 6 year total I'm your man for anything guaranteed satisfied 100%

Recommended by100%of homeowners
Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Faber, VA and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Avatar for Absolute Construction
Absolute Construction
5.0(
1
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Faber, VA and surrounding areas

In business since 1990

Free estimates

Emergency services offered

Absolute Construction has was brought to life in 1990 and started with one truck and a man with a dream to help others bring their home ideas to life and fast forward almost 35 years and Absolute has continued to grow. We provide all over service, from the simplest fixes to full home builds and remodels Absolute Construction does it all. We take the time to sit down and go over every possible need and want a customer has. We believe that true personal touches make the difference and changes a good experience to an amazing experience. Every builder/ worker affiliated with Absolute Construction are Licensed, Insured and Certified to build in their particular field. Doing this, we make sure you as the customer are receiving the best of the best service possible. Our main mission is to provide a memorable experience, one you can look back at and know you that you will always call us back for more work and you are excited to tell your friends and family about us.

Company
Electrical
Electrical being ran
Additional Photos
Additional Photos

+33

Recommended by100%of homeowners
Install Above Ground Pools questions, answered by experts

It depends on your priorities. Many homeowners enjoy the health benefits of a swim spa. The heated water boasts the benefits of a hot tub, which some people find helps relieve pain, increase circulation, and aid in stress relief. You’ll also be able to use it for exercise like you would a lap pool. It’s a two-in-one product.

Factors affecting pool installation costs include pool size, construction material, special features (like lighting or waterfalls), landscaping, and prevailing site conditions, which might enhance excavation complexity.

The disadvantages of container pools come down to flexibility and customization. Shipping containers come in standard sizes, so the sizes and shapes are limited. They also have a very distinctive look, which may not suit the aesthetic of your backyard. 

Beyond that, while container pools are more affordable than in-ground pools, certain models can be more expensive. This includes the cost to heat your pool, since the metal walls have more heat transfer than other types of pools (which some brands circumvent with insulation).

Upkeep. Like standard pools, the cost to maintain and service your pool is a factor. However, the benefit of a spool is that it can warm up in as little as 15 minutes, while it may take several hours to heat a standard pool. This makes owning a spool more cost-effective and energy-conscious.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Faber, VA homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.