Top-rated basement remodelers.

Get matched with top basement remodelers in Monument Valley, UT

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Monument Valley, UT?

Select your specific project to find the pro for you.

Find Basement remodelers in Monument Valley

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Monument Valley, UT and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Basement Remodel questions, answered by experts

While bathrooms and kitchens are nearly equal in terms of renovation difficulty, kitchens are the most challenging. Kitchen design, layout, electrical, and plumbing needs all depend on each other for the success of the entire project, and mistakes early in the project can cause trouble later on.

Anything having to do with the structure of your home, such as raising the ceiling, is usually the most expensive part of finishing a basement. Another project component that could be a surprisingly high expense is adding an exterior entrance. 

The cost of a walkout basement can be anywhere from $5,000 to $35,000.

Yes, most general contractors require an initial down payment. A reasonable deposit is typically between 10% and 25% of the total project cost, although this can vary by project size and location. This upfront payment helps the contractor cover initial costs like materials, permits, licensing, and hiring subcontractors. The remaining balance is usually billed according to a schedule outlined in your contract, often tied to project milestones or completion dates. Be cautious of contractors who ask for a large deposit of 50% or more, as this could be a red flag for a scam.

Yes, most general contractors require an initial down payment, typically between 10% and 25% of the total project cost. This upfront payment helps cover the costs of materials, permits, and subcontractors. The remaining project costs are usually billed after specific project milestones are reached or on set completion dates, as outlined in your contract. Be wary of contractors who require a significant deposit of 50% or more upfront, as this could be a red flag for a scam.

Yes, you can add a bathroom to an unfinished basement, but you’ll want to take proper precautions if doing so. As with any bathroom addition, you’ll need to make sure that it’s approved by local building authorities first. With unfinished basements, you especially need to keep an eye on proper ventilation practices.

The Monument Valley, UT homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.